Search

Your search keyword '"Mohammad Khalilzadeh"' showing total 46 results

Search Constraints

Start Over You searched for: Author "Mohammad Khalilzadeh" Remove constraint Author: "Mohammad Khalilzadeh" Database OpenAIRE Remove constraint Database: OpenAIRE
46 results on '"Mohammad Khalilzadeh"'

Search Results

1. A hybrid metaheuristic approach for solving a bi-objective capacitated electric vehicle routing problem with time windows and partial recharging

5. Assessing employees’ job motivation using BWM method and fuzzy goal programming: a case study of a petrochemical company

9. TOWARDS AN EFFICIENT APPROACH FOR IDENTIFICATION AND SELECTION OF STAKEHOLDER ENGAGEMENT STRATEGIES: A CASE STUDY

10. Identifying and Prioritizing the Challenges and Obstacles of the Green Supply Chain Management in the Construction Industry Using the Fuzzy BWM Method

12. Investigation of the Effects of Knowledge Management on Organizational Performance Through Human Resource Management as Mediator

13. Optimal project portfolio selection with reinvestment strategy considering sustainability in an uncertain environment: a multi-objective optimization approach

14. Green two-echelon closed and open location-routing problem: application of NSGA-II and MOGWO metaheuristic approaches

15. An Analysis of the Operation Factors of Three PSO-GA-ED Meta-Heuristic Search Methods for Solving a Single-Objective Optimization Problem

18. Performance Prediction of Construction Projects Based on the Causes of Claims: A System Dynamics Approach

19. The sustainable two-echelon location-routing problem considering combined open and closed routes under uncertainty

24. Application of Three Metaheuristic Algorithms to Time-Cost-Quality Trade-Off Project Scheduling Problem for Construction Projects Considering Time Value of Money

26. An Integrated Decision Support Model Based on BWM and Fuzzy-VIKOR Techniques for Contractor Selection in Construction Projects

27. A New Two-Stage Approach for a Bi-Objective Facility Layout Problem Considering Input/ Output Points Under Fuzzy Environment

29. Improving intermittent demand forecasting based on data structure

31. A Fuzzy Multi-Objective Supplier Selection Model with price and wastages considerations

35. Electrochemical detection of carbidopa using a ferrocene-modified carbon nanotube paste electrode

36. Emotional Stress Recognition System Using EEG and Psychophysiological Signals: Using New Labelling Process of EEG Signals in Emotional Stress State

43. Designing and constructing an optical system to measure continuous and cuffless blood pressure using two pulse signals

Catalog

Books, media, physical & digital resources