14 results on '"Longo J"'
Search Results
2. Electrochemical investigations of the system Li/UO/sub 2/F/sub 2/
3. SOME NEW TERNARY OXIDES OF RHENIUM (thesis)
4. OPTIMIZATION METHOD OF REACTOR SIZING WHICH ACCOUNTS FOR SYSTEM AND TECHNOLOGICAL CONSTRAINTS.
5. SUMMARY OF KAPL (D1G) INVESTIGATION OF BURNOUT DURING PERIOD FEBRUARY 19, 1958 THROUGH MAY 6, 1958. Appendix A. STATUS OF EVALUATION OF WAPD-TH-188 RECTANGULAR CHANNEL BURNOUT CORRELATION. Appendix B. PROGRESS REPORT FOR STATISTICAL EVALUATION OF BURNOUT WITH WATER FLOWING IN RECTANGULAR CHANNELS AT 2000 PSIA
6. A STATISTICAL INVESTIGATION OF SUBCOOLED BURNOUT WITH UNIFORM AND LOCALLY PEAKED HEAT FLUXES. Cover carries title: A STATISTICAL STUDY OF SUBCOOLED BURNOUT INCLUDING THE EFFECTS OF LOCAL HOT SPOTS
7. CONTINUATION OF KAPL (D1G) INVESTIGATION OF BURNOUT
8. COMPILATION OF EXPERIMENTAL BURNOUT DATA AS OF MARCH 1958
9. ALKALI METALS BOILING AND CONDENSING INVESTIGATIONS. Quarterly Progress Reports 2 and 3, September 31, 1962-March 31, 1963
10. Desulfurization of hot gas with cerium oxide
11. UO/sub 2/F/sub 2/ inclusion compositions
12. Cells having cathodes containing C/sub s/S cathode-active materials
13. Process for the desulfurization of flue gas
14. Process for the desulfurization of flue gas
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.