Search

Your search keyword '"Bello S"' showing total 301 results

Search Constraints

Start Over You searched for: Author "Bello S" Remove constraint Author: "Bello S" Database Unpaywall Remove constraint Database: Unpaywall
301 results on '"Bello S"'

Search Results

2. Optimizing the ITER NBI ion source by dedicated RF driver test stand

8. Corrigendum to “Status of SPIDER beam source after the first 3.5 years of operation” [Fusion Engineering and Design, Volume 192, July 2023, 113831]

11. Highlights of recent SPIDER results and improvements

14. Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

16. Design of a large nonevaporable getter pump for the full size ITER beam source prototype

18. SPIDER, the Negative Ion Source Prototype for ITER: Overview of Operations and Cesium Injection

21. Improved Conceptual Design of the Beamline for the DTT Neutral Beam Injector

24. Covid-19 and Cytokine Storm

26. Lymphocytic exhaustion in Covid-19 patients

32. First operations with caesium of the negative ion source SPIDER

38. Effect of the COVID-19 pandemic on blood donations and transfusions in Nigeria – A multi-facility study of 34 tertiary hospitals

41. On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress

47. Calidad del broncoscopio de un solo uso Ambu aScope4tm en broncoscopias convencionales : estudio multicéntrico en 21 servicios de neumología españoles.

Catalog

Books, media, physical & digital resources