1. Passive Active Multi-Junction 3, 7 GHZ launcher for Tore-Supra Long Pulse Experiments. Manufacturing Process and Tests
- Author
-
D. Guilhem, J. Achard, J. Belo, B. Bertrand, Z. Bej, Ph. Bibet, C. Brun, M. Chantant, E. Delmas, L. Delpech, Y. Doceul, A. Ekedahl, C. Goletto, M. Goniche, J. C. Hatchressian, J. Hillairet, M. Houry, P. Joubert, M. Lipa, S. Madeleine, A. Martinez, M. Missirlian, S. Poli, C. Portafaix, D. Raulin, A. Saille, B. Soler, D. Thouvenin, J. M. Verger, K. Vulliez, B. Zago, Volodymyr Bobkov, and Jean-Marie Noterdaeme
- Subjects
Engineering ,Klystron ,business.industry ,Electrical engineering ,Plasma ,Tore Supra ,Coupling (probability) ,Electromagnetic radiation ,law.invention ,Optics ,law ,Radio frequency ,Antenna (radio) ,business ,Energy (signal processing) - Abstract
The design and the fabrication of a new Lower Hybrid (LH) actively cooled antenna based on the passive active concept is a part of the CIMES project (Components for the Injection of Mater and Energy in Steady-state). The major objectives of Tore-Supra program is to achieve 1000 s pulses with this LH launcher, by coupling routinely >3 MW of LH wave at 3.7 GHz to the plasma with a parallel index n{sub ||} = 1.7 {sup {+-}}{sup 0.2}. The launcher is on its way to achieve its validation tests--low power Radio Frequency (RF) measurements, vacuum and hydraulic leak tests--and will be installed and commissioned on plasma during the fall of 2009.
- Published
- 2009
- Full Text
- View/download PDF