1. Estimation and Optimization of Cable Force in Completion State of Cable-Stayed Bridge
- Author
-
Bao Lei Li and Xun Wu
- Subjects
Completion Status ,Engineering ,Completion (oil and gas wells) ,business.industry ,General Medicine ,Structural engineering ,Cable stayed ,State (computer science) ,Continuous beam ,business ,Internal forces ,Bridge (nautical) ,Domain (software engineering) - Abstract
The reasonable cable force is the key factor for the safe use of cable-stayed bridge. This paper adopts the method of continuous beam on rigid supports, zero displacement method and the internal force balanced method for cable force estimation of completion stage. The estimation value of cable force is determined by comprehensive considering various methods. With the estimate value as the initial cable force of feasible domain method, conducting the cable force optimization. Comparing the optimization with estimation value and conducting analysis calculation to ensure the rational completion status. Referring a cable-stayed bridge’s example, and conducting the estimation and optimization of cable force, the calculated results meet the requirements. The results show that the method is effective and practical.
- Published
- 2015
- Full Text
- View/download PDF