Search

Showing total 5 results
5 results

Search Results

1. Experimental Study of Twisting First Generation BSCCO Tapes.

2. Full Power Test of a 36.5 MW HTS Propulsion Motor.

3. Phase II of the Albany HTS Cable Project.

4. Development and Demonstration of a Fault Current Limiting HTS Cable to be Installed in the Con Edison Grid.

5. Installation and Testing Results of Long Island Transmission Level HTS Cable.