Search

Showing total 5 results
5 results

Search Results

1. A new double flexible job-shop scheduling problem integrating processing time, green production, and human factor indicators.

2. An algebraic approach for supply network synthesis.

3. Scheduling of unrelated parallel machines considering sequence-related setup time, start time-dependent deterioration, position-dependent learning and power consumption minimization.

4. On the flexibility of an eco-industrial park (EIP) for managing industrial water

5. Synthesis of batch water network for a brewery plant