Search

Your search keyword '"MATERIAL requirements planning"' showing total 67 results

Search Constraints

Start Over You searched for: Descriptor "MATERIAL requirements planning" Remove constraint Descriptor: "MATERIAL requirements planning" Journal journal of operations management Remove constraint Journal: journal of operations management
67 results on '"MATERIAL requirements planning"'

Search Results

1. The early road to material requirements planning

2. Effects of simplicity and discipline on operational flexibility: An empirical reexamination of the rigid flexibility model

3. Action variety of planners: Cognitive load and requisite variety

4. The operating impact of parts commonality.

5. Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty.

6. An analysis of Material Requirements Planning (MRP) benefits using Alternating Conditional Expectation (ACE).

7. Using production and transfer batches in flowshops under MRP control.

8. Freezing the master production schedule for material requirements planning systems under demand uncertainty.

9. The effects of lot sizing and dispatching on customer service in an MRP environment.

10. A Modified MRP for a Production System with the Coexistence of MRP and Kanbans.

11. An Exploratory Study of the Manufacturing Strategy Process in Practice.

12. MRP Strategies: Effects on Cash Flow.

13. The Impact of Safety Stock on Schedule Instability, Cost and Service.

14. Choosing Optimal Buffering Strategies for Dealing with Uncertainty in MRP.

15. Safety Stocks and Component Commonality.

16. Toward a Better Understanding of Lead Times in MRP Systems.

17. Overlapping Operations in Material Requirements Planning.

18. Manufacturing Lead Time Accuracy.

19. Time-Dependent Demand in Requirements Planning: An Exploratory Assessment of the Effects of Serially Correlated Demand Sequences on Lot-Sizing Performance.

20. The Interchangeability of Safety Stocks and Safety Lead Time.

21. The Effect of Various Production Strategies on Product Structures with Commonality.

22. A Heuristic Algorithm for Capacity Sensitive Requirements Planning.

23. Multiplant MRP.

24. The Cost of Inflated Planned Lead Times in MRP Systems.

25. Resolving Uncertainty in Manufacturing Systems.

26. MRP With High Uncertain Yield Losses.

27. Constrained Resource Project Scheduling Subject To Material Constraints.

28. Computer Simulation of Lot-Sizing Algorithms In Three-Stage Multi-Echelon Inventory Systems.

29. Irregular Workloads with MRP Systems: Some Causes and Consequences.

30. A Heuristic Solution Procedure for the Multi-Item, Single-Level, Limited Capacity, Lot-Sizing Problem.

31. An Empirical Investigation of Different Strategies for Material Requirements Planning.

32. Capacity Planning Techniques for Manufacturing Control Systems: Information Requirements and Operational Features.

33. Some Observations on the Advantages and Implementation Issues of Just-in-Time Production Systems.

34. A Lot Sizing and Sequencing Algorithm for Dynamic Demands upon a Single Facility.

35. A Study of the MRP Implementation Process.

36. Research Issues for Multi-Level Lot Sizing in MRP Systems.

37. The Implementation of Computer Based Systems.

38. A Study of MRP Benefits and Costs.

39. Priority Rules for Check Processing in Multiple Branch Banking: An Experimental Analysis.

40. A Forma Set Of Algorithms For Project Scheduling/Material Requirements Planning.

41. A Comparison of MRP Lot Sizing Methods Considering Capacity Change Costs.

42. A Dispute on James R. Evans' "An Efficient Implementation of the Wagner-Whitin Algorithm for Dynamic Lot-Sizing," Journal of Operations Management, Vol. 5, No. 2, February 1985.

43. The early road to material requirements planning

44. The planning flexibility bottleneck in food processing industries

45. Linking performance drivers in production planning and inventory control to process choice

46. Alternative approaches for reducing schedule instability in multistage manufacturing under demand uncertainty

47. An analysis of Material Requirements Planning (MRP) benefits using Alternating Conditional Expectation (ACE)

48. The effects of lot sizing and dispatching on customer service in an MRP environment

50. Material Requirements Planning (MRP) and Purchase Discounts.

Catalog

Books, media, physical & digital resources