Search

Showing total 8 results
8 results

Search Results

1. Slip–Stick Mechanism in Training the Superconducting Magnets in the Large Hadron Collider.

2. The Construction of the Model of the Curved Fast Ramped Superconducting Dipole for FAIR SIS300 Synchrotron.

3. EDIPO Quench Detection System: Concept and Development.

4. Consolidation of the 13 kA Interconnects in the LHC for Operation at 7 TeV.

5. Status of the EDIPO Project.

6. Joint Design for the EDIPO.

7. Status Report on the Series Production of the Main Superconducting Dipole Magnets for LHC.

8. Magnet Design and Testing for the 250 MeV Injector of the SwissFEL at the Paul Scherrer Institute.