Search

Showing total 5 results
5 results

Search Results

1. Slip–Stick Mechanism in Training the Superconducting Magnets in the Large Hadron Collider.

2. Performance of a Nb3Sn Quadrupole Under High Stress.

3. Final Development and Test Preparation of the First 3.7 m Long Nb3Sn Quadrupole by LARP.

4. Commissioning of the Low-β Triplets of the Large Hadron Collider.

5. Fabrication and Test of a 3.7 m Long Support Structure for the LARP Nb3Sn Quadrupole Magnet LQS01.