1. Efficiency of Working Layout and Handling Materials Using the Activity Relationship Chart Method.
- Author
-
Prakoso, Bayu Adi, Oktaviandy, Deo, Y. R., Kevin Yulio, and Andika, Aditya
- Subjects
MATERIALS handling ,MANUFACTURING industries ,PLASTIC roofing ,RAW materials ,MANUFACTURING processes - Abstract
PT. XYZ is a manufacturing company engaged in the manufacture of plastic roof. The products produced are Alderon, RS, Flat, and Wuwungan. In production requires a lot of raw materials, but the company does not have an area where raw materials. The production process of PT. XYZ uses forklift transport equipment. Obtained material handling transfer cost at the initial layout of Rp28,403,362.45. Therefore, it is necessary to design a new layout and design a warehouse proposal. Obtained material handling transfer cost in the ARC proposal layout of Rp19,360,439.60 with efficiency of 32%. It also created a comparative layout using corelap software. Obtained the cost of material handling movement on the layout of the proposed software corelap of Rp23,957,207.44 with an efficiency of 16%. So in this case the proposed layout ARC layout is better because it can save 32% cost of material movement from the initial layout. [ABSTRACT FROM AUTHOR]
- Published
- 2022