Search

Your search keyword '"TBM"' showing total 392 results

Search Constraints

Start Over You searched for: Descriptor "TBM" Remove constraint Descriptor: "TBM" Publication Year Range Last 3 years Remove constraint Publication Year Range: Last 3 years
392 results on '"TBM"'

Search Results

1. Indications for oropharyngeal biopsy in head and neck squamous cell carcinoma of unknown primary: A systematic review (HNSCCUP).

2. Application of DFN approach for the selection of maximized penetration rate model of TBM in hard rock.

3. Analysis of Rock Breaking Load Characteristics and Efficiency Optimization of Roller Cutters under Multi-Factor Coupling.

4. Effects of sand and slurry characteristics on pressure infiltration of bentonite slurry into sand.

5. A Test System for Microwave-Assisted Dual-Mode Mechanical Cutting of Hard Rock Under True Triaxial Compression.

6. Characterization of particle exposure during tunnel excavation by tunnel boring machines.

7. 城市地铁隧道 TBM 推力扭矩优质利用率 区间评估研究.

8. Research on Prediction of Excavation Parameters for Deep Buried Tunnel Boring Machine Based on Convolutional Neural Network-Long Short-Term Memory Model.

9. The Influence of Metro Tunnel Construction Parameters on the Settlement of Surrounding Buildings.

10. Experimental Study on the Effect of Temperature on the Characteristics of Cutterhead Mud Cake in Complex Red-Bed Geology.

11. Water saturation effects on the fracturing mechanism of sandstone excavating by TBM disc cutters.

12. 超长距离 TBM 施工运输调度管理系统 ———以北疆某供水工程为例.

13. 小断面 TBM 全长锚固锚杆受力特性研究及参数优化.

14. Evaluation of side forces for gauge cutters through LS-DYNA 3D numerical simulations.

15. 全断面隧道掘进机在煤矿领域新技术应用.

16. Towards Sustainable Tunnelling: An Integrated Framework for Carbon Assessments in TBM Tunnels

17. Numerical Study of Hydraulic Fracturing Assisted Rock Breaking Based on Discrete Element Method

20. Deformation Analysis of Deep Buried Soft Rock Tunnel and Adaptive Control Measure of TBM Construction

21. An Explicit Finite Element Approach to TBM Disc Cutter-Induced Rock Fragmentation Simulation

23. A Preventive Maintenance Strategy of Wind Turbine Gearbox Based on Stochastic Differential Equation

25. Analytical determination of the stress-strain state of soil mass during tunnelling

26. Predicting advance rate and cutter life in TBM tunnelling using evolutionary algorithm.

27. Carbon Footprint Evaluation in Tunnels Excavated in Rock Using Tunnel Boring Machine (TBM).

28. Analysis and Enlightenment on the Relationships between Two Kinds of Cutter Life Evaluation Indexes and Installation Radius: A Case Study.

29. 基于 TBM 掘进大数据和特征参数的引水隧洞塌方分析.

30. 铁路隧道 TBM 施工物料运输方式对比分析.

31. 基于图像识别的 TBM 隧道围岩条件与岩渣级配相关性研究.

32. A case study of tunnel boring machines advance rate prediction using meta-heuristic techniques.

33. Study on the Characteristics and Mechanism of Shield Tunnel Mud Cake Disintegration in Complex Red-Bed Geology.

36. Research on Dynamic Characteristics of the Two-stage Planetary Gear Transmission System of TBM Reducers

37. Vibration prediction and analysis of the main beam of the TBM based on a multiple linear regression model

38. Workshop Manajemen Organisasi dan Penyusunan Modul Dolanan Anak Bagi Forum Taman Baca Masyarakat (FTBM) di Kabupaten Jepara

39. Investigation of Disc Cutter Wear in Tunnel-Boring Machines (TBMs): Integration of Photogrammetry, Measurement with a Caliper, Weighing, and Macroscopic Visual Inspection.

40. A Novel Identification Approach Using RFECV–Optuna–XGBoost for Assessing Surrounding Rock Grade of Tunnel Boring Machine Based on Tunneling Parameters.

41. TB LAMP assay, a beneficial tool for the diagnosis of Tubercular meningitis in resource-limited settings.

42. 超特长隧洞TBM 智能辅助掘进技术研究及应用.

43. HSP 超前探测技术在煤矿 TBM 掘进巷道中的应用研究.

44. Vibration prediction and analysis of the main beam of the TBM based on a multiple linear regression model.

45. TBM 窄刃刀与标准刀现场性能对比测试与分析.

46. Backstepping Based Trajectory Tracking Control of a TBM Steel Arch Splicing Manipulator.

47. 大埋深 TBM 主驱动密封洞内修复及 改造关键技术研究.

48. 岩体节理及岩块力学参数对 TBM 净掘进 速率的影响.

49. 基于模糊证据推理的 TBM 隧洞施工安全风险评价.

50. Research on an Active Vibration Isolation System with Hybrid Control Strategy for The Guidance System of TBM.

Catalog

Books, media, physical & digital resources