Search

Your search keyword '"Li-Ning Xing"' showing total 39 results

Search Constraints

Start Over You searched for: Author "Li-Ning Xing" Remove constraint Author: "Li-Ning Xing" Publication Year Range Last 50 years Remove constraint Publication Year Range: Last 50 years
39 results on '"Li-Ning Xing"'

Search Results

1. A Hybrid Discrete Differential Evolution Algorithm to Solve the Split Delivery Vehicle Routing Problem

2. Tabu Search Algorithm for the Bike Sharing Rebalancing Problem

3. Multi-mobile robots and multi-trips feeding scheduling problem in smart manufacturing system: An improved hybrid genetic algorithm

4. A Knowledge-Based Simulated Annealing Algorithm to Multiple Satellites Mission Planning Problems

5. The Novel Heuristic for Data Transmission Dynamic Scheduling Problems

17. Techno-Economic and Environmental Assessment of the Hybrid Energy System Considering Electric and Thermal Loads

18. Selection of mine development scheme based on similarity measure under fuzzy environment

19. Double layer programming model to the scheduling of remote sensing data processing tasks

20. Large-scale and adaptive service composition based on deep reinforcement learning

22. Electronic Satellite Scheduling Problem and its Heuristic Method

23. An Intelligent Approach to Dynamic Scheduling System of Earth Observation Satellites

24. Research on Joint Scheduling of Multiple Imaging Satellites with Multiple Sensors

25. A novel mutation operator based on the immunity operation

27. A hybrid genetic algorithm for unconstrained global numerical optimisation

28. Comprehensive multi-objective model to remote sensing data processing task scheduling problem

29. Dynamic Structure-Based Neural Networks Determination Approach Based on the Orthogonal Genetic Algorithm with Quantization

30. Interactive Fuzzy Multi-objective Ant Colony Optimization with Linguistically Quantified Decision Functions for Flexible Job Shop Scheduling Problems

31. The Multi-Rule & Real-Time Training Neural Network Model for Time Series Forecasting Problem

32. An Improved Multi-agent Approach for Solving Large Traveling Salesman Problem

33. A Constraint Satisfaction Adaptive Neural Network with Dynamic Model for Job-Shop Scheduling Problem

35. A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations.

36. A Hybrid Multiobjective Evolutionary Approach for Flexible Job-Shop Scheduling Problems.

37. Double Layer ACO Algorithm for the Multi-Objective FJSSP.

38. A hybrid genetic algorithm for unconstrained global numerical optimisation.

39. A Hybrid Ant Colony Optimization Algorithm for the Extended Capacitated Arc Routing Problem.

Catalog

Books, media, physical & digital resources