1,525 results on '"removal"'
Search Results
2. High-level waste management research and development program at Oak Ridge National Laboratory
3. Tritium in nuclear fusion power
4. Some preliminary considerations of a molten-salt extraction process to remove tritium from liquid lithium fusion reactor blankets
5. Methods for removal of actinides from high-level wastes
6. Operating experience with plutonium materials in experimental reactors
7. Proceedings of the symposium on tritium technology related to fusion reactor systems, Miamisburg, Ohio, October 1--2, 1974
8. Fate of plutonium intercepted by leaf surfaces: leachability and translocation to seed and root tissues
9. Tritium removal: a preliminary evaluation of several getters
10. Tritium containment and recovery in fusion reactor systems
11. Technological assessment of the reference theta-pinch reactor (RTPR)
12. Development of a feasible process for the simultaneous removal of nitrogen oxides and sulfur oxides from fossil fuel burning power plants
13. Effect of Drying and Heat-Setting Temperatures on the Removal Characteristics of Polyvinyl Alcohol Size.
14. Removal of mercury from aqueous solutions by shredded rubber
15. Sodium removal disassembly and examination of the Fermi secondary sodium pump
16. Investigation of a perfusion impaction dust separator
17. METROMEX 1974: a summary of operations conducted by Atmospherics Incorporated during the period 7 July--17 August 1974. [Aerial monitoring of air pollution over St Louis area]
18. Development program on pressurized fluidized-bed combustion. Quarterly report, October 1, 1974--January 1, 1975. [Air pollution control]
19. Development program on pressurized fluidized-bed combustion. Quarterly report, January 1, 1975--April 1, 1975. [Use of precalcined and uncalcined limestone and dolomite; work on inorganic constituents of combustion flue gas]
20. Hot low Btu producer gas desulfurization in fixed bed of iron oxide fly-ash. Quarterly report No. 1, 1 July--30 September 1975
21. Development program on pressurized fluidized-bed combustion. Progress report, 1 July 1974--1 October 1974. [Burning coal in fluidized bed of particulate lime solids that react with S compounds formed during combustion to reduce air pollution; N oxides also reduced]
22. Development program on pressurized fluidized-bed combustion. Annual report, July 1, 1974--June 30, 1975
23. Particle and gaseous removal in the atmosphere by dry deposition
24. Potassium release from some semi-arid region soils
25. Predicted dry deposition velocities
26. Organic hydrogen getters. Part I. Introductory report
27. P-11 Facility cleanup summary report
28. Nuclear waste management and transportation. Quarterly progress report, October--December 1974
29. Evaluation of methods for retention of radioiodine during processing of irradiated $sup 237$Np
30. Chromate abatement in the Y-12 Plant's New Hope Pond
31. Models for predicting the removal of airborne contaminants by reactor containment sprays
32. Imbibition-displacement of an aqueous interstitial liquor by an organic fluid containing a surfactant
33. Contamination limits for real and personal property. Progress report, January--June 1975
34. Performance of a uranium getter bed for removing deuterium from a flowing inert gas
35. Process technology for the molten-salt reactor $sup 233$U--Th cycle
36. Analysis of the stored energy distribution in D-reactor
37. Determination of possibility of film removal by increased water flow
38. Operational safety report for the cleaning of non-radioactive, sodium-wetted reactor components with ethyl alcohol
39. Nitric acid recovery and ammonia removal: Modifications to the Redox dissolver off-gas systems
40. Review of literature on catalytic recombination of hydrogen--oxygen. [Removal of hydrogen from containment atmosphere following LWR blowdown]
41. Existing reactor containment program
42. Development of new methods for removing ruptured slugs
43. Numerical results of production test IP-326-I, low flow calibration tests at DR and C reactors, and of production test IP-395-I, removal of high tank discharge line strainer gates at B, D, and F reactors
44. Preliminary study of the removal and recovery of plutonium from Recuplex process waste
45. Circumventing chloride ion trouble Columbia River water
46. In-pile defilming of process tubes
47. Process test MR-105-25 reactor purge at low concentrations
48. Production test 105-12-MR crossheader purge with chromic acid
49. Production test IP-740 phosphate capture subsequent to filtering. Final report
50. Purification of mercury contaminated lithium hydroxide
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.