88 results on '"Egner, Sébastien E."'
Search Results
2. The concurrent design strategy for astronomical instrumentation: tools and methodology
3. GMT integrated FEM and its role in systems engineering
4. A collaborative tool and approach for the hazard analysis and risk assessment process at TMT International Observatory
5. End-to-end simulation for on-sky coupling to single-mode fibers of large optical telescopes
6. A bottoms-up approach to reliability estimation at the Thirty Meter Telescope International Observatory
7. TMT International Observatory safety system design from hazard analysis to functional logic
8. From the idea to the product: a single source of information for all stakeholders in systems engineering context via Siemens Teamcenter
9. Configurable slit unit versus slit mask exchanger trade study for the TMT wide field optical spectrometer
10. Systems engineering for the future Gemini instrument GIRMOS: applying space industry concepts to astronomy
11. From rags to riches: a 19th century stable transformed into a modern concurrent design facility
12. Systems engineering support on the detector subsystem of the LiteBIRD low-frequency telescope in the pre-phase A and phase A
13. CMB-S4 systems engineering
14. GMT primary mirror thermal control system and thermal deformation modeling framework
15. Aerothermal modeling of the TMT International Observatory Laser Guide Star Facility
16. The TMT International Observatory aerothermal performance estimation procedure
17. A computational framework for the study of the diurnal thermo-mechanical behavior of the Giant Magellan Telescope
18. Analysis of the PSF moments of the Simonyi Survey Telescope
19. Introducing RayZaler: a free opto-mechanical simulation framework
20. Theoretical limits on polarization differential imaging for the GSMTs imposed by polarization aberrations
21. JASMINE image simulator for high-precision astrometry and photometry
22. Spectral performance budget for ATHENA’s Wide Field Imager
23. Slitless spectroscopy simulations of Milky Way dwarf satellite galaxies using TMT-WFOS
24. Wind disturbance characterization for the MeerKAT extension dish structure
25. Overcoming obstacles to the assembly, integration, and testing of the WSS/METIS
26. Project management for ground-based telescope array development
27. Lessons learned: ALMA band-1 receiver project management
28. ANDES, the high-resolution spectrograph for the ELT: project management for the preliminary design phase
29. Concept study support of research projects
30. Innovative MBSE-based approach to the definition and management of cables and connectors applied to the development of astronomical instruments
31. ANDES, the high resolution spectrograph for the ELT: description of an innovative methodology for the verification of the internal and external interfaces using the MBSE approach
32. MORFEO at ELT system engineering after PDR, MBSE, and beyond
33. NOVA MAX: manufacturing and assembly facility for ELT-era instrumentation
34. Rubin Observatory operations: enabling collaborative ground-up budget planning across a multiteam organization
35. SOXS system engineering from design to installation: challenges and results
36. NFIRAOS integration phase: planning for capacity, integration, and other logistics
37. ANDES, the high resolution spectrograph for the ELT: RAM strategy during the preliminary design review
38. The state of the safety for the CUBES spectrograph at the preliminary design phase
39. Method for minimal disruptive electronic system upgrades at the Telescopio Nazionale Galileo
40. MAVIS: system design, delivery, reliability, availability, maintainability, and safety: integrated framework and tools
41. A safety-driven point of view on the use of industrial technologies: trade-off on the implementation
42. The RAM(S) analysis of the CUBES spectrograph for the preliminary design phase and developments
43. Cost-effective approach to quality assurance via failure modes and effects analysis for the development of GIRMOS for the Gemini North Telescope
44. Managing the mass production for the LAD instrument onboard eXTP
45. Product and quality assurance at production of ALMA receivers
46. PLM-driven manufacturing of medium-sized telescope structures of CTAO
47. Asset management for the ELT
48. RAM analysis and differences between space and ground-based astronomy
49. Hazard analysis process improvement from design, construction, and early operations
50. RAM strategy for MORFEO toward the final design review
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.