35 results on '"Hong, Taehoon"'
Search Results
2. A New Benchmark Model for the Automated Detection and Classification of a Wide Range of Heavy Construction Equipment
3. Framework of BIM-Based Quantitative Evaluation for Enhancing Fire Safety Performance of Buildings
4. Erratum for “Deep Learning–Based Automated Generation of Material Data with Object–Space Relationships for Scan to BIM”
5. Deep Learning–Based Automated Generation of Material Data with Object–Space Relationships for Scan to BIM
6. Deep Learning–Based Automation of Scan-to-BIM with Modeling Objects from Occluded Point Clouds
7. Evolutionary Game Analysis of Green Loans Program to Achieve the National Carbon Emissions Reduction Target in South Korea
8. Advanced Real-Time Pollutant Monitoring Systems for Automatic Environmental Management of Construction Projects Focusing on Field Applicability
9. Feasibility Analysis of COVID-19 Response Guidelines at Construction Sites in South Korea Using CYCLONE in Terms of Cost and Time
10. Estimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project’s Attributes
11. Housing Market Trend Forecasts through Statistical Comparisons based on Big Data Analytic Methods
12. Mapping the Rescue Equipment Mobilization Potential: Decision Support Tool for Emergency Management
13. Model for Evaluating the Financial Viability of the BOT Project for Highway Service Areas in South Korea
14. Prediction of Environmental Costs of Construction Noise and Vibration at the Preconstruction Phase
15. Conversion Method for Obtaining CO2 Emission Data from the Life Cycle Inventory Database of Foreign Countries
16. Prediction Model of CO2 Emission for Residential Buildings in South Korea
17. Assessment Model for Energy Consumption and Greenhouse Gas Emissions during Building Construction
18. Framework of Manufacturer and Supplier Relationship in the Manufactured Housing Industry
19. Construction Business Cycle Analysis Using the Regime Switching Model
20. Life-Cycle Cost Analysis on Glass Type of High-Rise Buildings for Increasing Energy Efficiency and Reducing CO2 Emissions in Korea
21. Determining the Value of Governmental Subsidies for the Installation of Clean Energy Systems Using Real Options
22. Trends and Prospects of the U.S. Housing Market Using the Markov Switching Model
23. Revised Case-Based Reasoning Model Development Based on Multiple Regression Analysis for Railroad Bridge Construction
24. Energy-Saving Techniques for Reducing CO2 Emissions in Elementary Schools
25. Analysis of Development Cost Based on Planning Characteristics of Multifamily Housing Development Projects
26. Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building
27. Selection Model for Delivery Methods for Multifamily-Housing Construction Projects
28. Integrated Schedule and Cost Model for Repetitive Construction Process
29. Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea
30. Analysis of Techniques Leading to Radical Reduction in Project Cycle Time
31. Effect of Delivery Methods on Design Performance in Multifamily Housing Projects
32. Project Manager’s Decision Aid for a Radical Project Cycle Reduction
33. Construction, Inspection, and Maintenance of FRP Deck Panels
34. Validation of a Model for Predicting Schedule Changes in Highway Work Zones—Case Studies
35. Model for Analysis of Factors Affecting Construction Schedule in Highway Work Zones
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.