1. A Cultural Resources Survey of Approximately 27 Miles of the Existing and Proposed New Alignment of State Route 88 Between Tonto National Monument and Claypool, Gila County, Arizona
- Author
-
Barz, David D.
- Subjects
AZ V:9:60 (ASM)/AR-03-12-02-207 ,AZ V:5:212 (ASM)/AR-03-12-02-1367 ,Theodore Roosevelt Lake ,Artifact Scatter ,AZ V:9:325 (ASM)/AR-03-12-02-907 ,AZ V:5:221 (ASM)/AR-03-12-02-1372 ,AZ V:9:6 (ASM)/AR-03-12-02-77 ,AZ V:5:219 (ASM)/AR-03-12-02-994 ,AZ V:5:198 (ASM)/AR-03-12-02-1333 ,AZ V:9:61 (ASM)/AR-03-12-02-208 ,AZ U:8:611 (ASM)/AR-03-12-06-2481 ,Ancient Structure ,AZ V:5:200 (ASM)/AR-03-12-02-1335 ,AZ V:5:204 (ASM)/AR-03-12-06-2018 ,Tonto National Monument ,AZ V:5:211 (ASM)/AR-03-12-02-1366 ,AZ V:5:203 (ASM)/AR-03-12-06-1931 ,AZ U:8:630 (ASM)/AR-03-12-06-2494 ,PaleoIndian ,AR-03-12-02-1332 ,AZ V:9:364 (ASM)/AR-03-12-02-1329 ,AZ V:9:386 (ASM)/AR-03-12-02-80 ,AZ V:5:222 (ASM)/AR-03-12-02-85 ,Road ,AZ U:8:616 (ASM)/AR-03-12-06-1927 ,Trail ,AZ V:9:63 (ASM)/AR-03-12-02-210 ,AZ V:5:202 (ASM)/AR-03-12-06-2489 ,AZ U:8:631 (ASM)/AR-03-12-06-2495 ,AZ V:5:210 (ASM)/AR-03-12-02-1365 ,AZ V:9:385 (ASM)/AR-03-12-02-81 ,AZ V:5:206 (ASM)/AR-03-12-06-2491 ,AZ V:9:392 (ASM)/AR-03-12-02-1378 ,AZ U:8:91 (ASM)/AR-03-12-06-2482 ,AZ U:8:621 (ASM)/AR-03-12-06-2488 ,AZ V:9:389 (ASM)/AR-03-12-02-1377 ,Chipped Stone ,AZ V:5:205 (ASM)/AR-03-12-06-2490 ,AZ U:8:617 (ASM)/AR-03-12-06-2486 ,Ceramic ,Archaic ,AZ V:5:220 (ASM)/AR-03-12-02-86 ,AZ V:5:199 (ASM)/AR-03-12-02-1334 ,Cairn ,AZ U:8:620 (ASM)/AR-03-12-06-2487 ,Salado ,AZ V:9:55 (ASM)/AR-03-12-02-203 ,AZ U:8:628 (ASM)/AR-03-12-06-188 ,Historic ,AZ V:5:207 (ASM)/AR-03-12-02-1362 ,AZ U:8:625 (ASM)/AR-03-12-06-1970 ,AZ V:9:388 (ASM)/AR-03-12-02-1376 ,AZ U:8:139 (ASM) ,Rock Alignment ,AZ V:9:56 (ASM)/AR-03-12-02-204 ,Historic Structure ,AZ V:9:365 (ASM)/AR-03-12-02-908 ,AZ V:5:216 (ASM)/AR-03-12-02-1370 ,AZ U:8:624 (ASM)/AR-03-12-06-1968 ,AZ V:5:225 (ASM)/AR-03-12-02-1374 ,AZ V:9:57 (ASM)/AR-03-12-02-205 ,Rock Shelter ,AZ U:8:629 (ASM)/AR-03-12-06-1930 ,AZ V:5:226 (ASM)/AR-03-12-02-975 ,AZ V:5:208 (ASM)/AR-03-12-02-1363 ,AZ V:5:215 (ASM)/AR-03-12-02-1369 ,Metal ,AZ V:9:387 (ASM)/AR-03-12-02-1375 ,AZ V:9:59 (ASM)/AR-03-12-02-206 ,AZ U:8:615 (ASM)/AR-03-12-06-1604 ,Canal or Canal Feature ,Hohokam ,AZ V:5:227 (ASM)/AR-03-12-02-900 ,Encampment ,Apache ,AZ V:5:223 (ASM)/AR-03-12-02-893 ,AZ U:8:614 (ASM)/AR-03-12-06-2485 ,AZ U:8:619 (ASM)/ AR-03-12-06-1929 ,AZ U:5:214 (ASM)/AR-03-12-02-993 ,AZ V:5:217 (ASM)/AR-03-12-02-1371 ,Ground Stone ,Tonto National Forest ,AZ V:5:218 (ASM)/AR-03-12-02-948 ,AZ V:8:390 (ASM)/AR-03-12-02-912 ,Tonto Basin ,AZ V:5:224 (ASM)/AR-03-12-02-1373 ,Railroad ,Agricultural Field or Field Feature ,AZ V:9:391 (ASM)/AR-03-12-02-952 ,AZ V:9:366 (ASM)/AR-03-12-02-903 ,AZ U:8:623 (ASM)/AR-03-12-06-1962 ,AZ V:5:209 (ASM)/AR-03-12-02-1364 ,AZ V:9:321 (ASM)/AR-03-12-02-1191 ,AZ U:8:613 (ASM)/AR-03-12-06-2484 ,AZ V:5:196 (ASM)/AR-03-12-02-1331 ,Tent Ring / Tipi Ring ,Room Block / Compound / Pueblo ,AZ U:8:627 (ASM)/AR-03-12-06-1972 ,AZ V:5:201 (ASM)/AR-03-12-06-1975 ,AZ V:5:213 (ASM)/AR-03-12-02-1368 ,AZ V:5:197 (ASM) ,AZ V:9:62 (ASM)/AR-03-12-02-209 ,Water Control Feature ,Systematic Survey ,AZ V:9:367 (ASM)/AR-03-12-02-78 ,AZ U:8:612 (ASM)/AR-03-12-06-2483 ,AZ V:5:195 (ASM)/AR-03-12-02-1330 ,Glass ,AZ U:8:618 (ASM)/AR-03-12-06-1928 ,AZ U:8:626 (ASM)/AR-03-12-06-1971 - Abstract
Archaeological Research Services, Inc. (ARS) performed a Class m (Intensive Field Inventory) cultural resources (archaeological) survey within a 300-to-600 ft wide corridor through both previously surveyed and unsurveyed Tonto National Forest (TNF), Tonto National Monument administered by the National Park Service (NPS), Arizona Department of Transportation (ADOT), and private land for the proposed upgrade of State Route 88 (SR 88) between Roosevelt and Claypool, Gila County, Arizona (ADOT Project No. F-038-1-308 [PE]; TRACS #088 GI 245 H2726 0lD). The survey was conducted at the request of RUST Environment and Infrastructure Inc. of Phoenix (RUST E&I Project No. 17618), and was performed under the conditions and authority of U.S. Tonto National Forest Special-Use Permit No. 2025-16. Submitted: November 3, 1995 Revised: April 26, 1996
- Published
- 1996
- Full Text
- View/download PDF