31 results on '"Crosbie E"'
Search Results
2. Simultaneous Resonance Extraction.
3. The Effect of a Delta Function Sextupole Field on Phase Space Trajectories.
4. Matching and Alignment from the Linac to the Zero Gradient Synchrotron.
5. Conceptual Design of the Argonne 6-GeV Synchrotron Light Source.
6. A 1500-MeV Fixed-Field Alternating-Gradient Synchrotron for a Pulsed-Spallation Neutron Source.
7. Effect of Synchrotron Radiation in the Proposed 4-GeV Argonne Microtron.
8. Conceptual design of a 1.1-GeV 500-μa fast cycling proton synchrotron.
9. Lattice Insertions for POPAE.
10. POPAE - A 1000 Gev on 1000 Gev Proton-Proton Colliding Beam Facility.
11. Preliminary Design of the High Intensity Synchrotron (HIS) for the Proposed Intense Pulsed Source Facility (IPNS) at Argonne.
12. The Design of the Zero Gradient Synchrotron Booster-II Lattice.
13. A preliminary design for a Tau-Charm Factory
14. Injecting a Kapchinskij-Vladimirskij distribution into a proton synchrotron
15. The APS transfer line from linac to injector synchrotron
16. A 1- to 5-MW, RCS-based, short-pulse spallation neutron source
17. Feasibility study of a 1-MW pulsed spallation source
18. Resonant Extraction at the Zero Gradient Synchrotron (ZGS).
19. Measurement of the Titanium Vacuum Chamber Eddy Current Fields and Pole Face Winding Corrections for the Zero Gradient Synchrotron (ZGS).
20. Establishment of a tolerance budget for the Advanced Photon Source storage ring.
21. Particle diffusion from resonance islands in ALADDIN at SRC.
22. Effects of construction and alignment errors on the orbit functions of the Advanced Photon Source Storage Ring.
23. First turn beam correction for the Advanced Photon Source storage ring.
24. Nonlinear resonance studies at the synchrotron radiation center, Stoughton, Wisconsin.
25. The APS transfer line from linac to injector synchrotron.
26. Effects of errors on the dynamic aperture of the Advanced Photon Source storage ring.
27. Injecting a Kapchinskij-Vladimirskij distribution into a proton synchrotron.
28. A preliminary design for a Tau-Charm Factory.
29. Feasibility study of a 1-MW pulsed spallation source.
30. Effects of vertical girder realignment in the Argonne APS storage ring.
31. A 1- to 5-MW, RCS-based, short-pulse spallation neutron source.
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.