1. Three-stage production cost modeling approach for evaluating the benefits of intra-hour scheduling between balancing authorities
- Author
-
Michael Milligan, Tao Guo, Nader Samaan, and Matthew Hunsaker
- Subjects
Schedule ,Engineering ,Wind power ,Power system simulation ,Job shop scheduling ,Operations research ,business.industry ,Real-time computing ,Load following power plant ,Economic dispatch ,Scheduling (production processes) ,Electricity ,business - Abstract
This paper introduces a production cost modeling approach for evaluating the benefits of intra-hour scheduling among Balancing Authorities (BAs). System operation is modeled in a three-stage sequential manner: day ahead (DA)-hour ahead (HA)?real time (RT). In addition to contingency reserve, each BA will need to carry out “up” and “down” load following and regulation reserve capacity requirements in the DA and HA time frames. In the RT simulation, only contingency and regulation reserves are carried out as load following is deployed. To model current RT operation with hourly schedules, a new constraint was introduced to force each BA net exchange schedule deviation from HA schedules to be within North American Electric Reliability Corporation (NERC) area control error (ACE) limits. Case studies that investigate the benefits of moving from hourly exchange schedules between Western Electricity Coordinating Council (WECC) BAs into 10-minute exchange schedules under two different levels of wind and solar penetration (11% and 33%) are presented.
- Published
- 2015
- Full Text
- View/download PDF