1. SIMULATION RESULTS OF RUNNING THE AGS MMPS, BY STORING ENERGY IN CAPACITOR BANKS
- Author
-
Ioannis Marneris
- Subjects
Power supply rejection ratio ,Engineering ,Switched-mode power supply ,Rotor (electric) ,business.industry ,Electrical engineering ,Thyristor ,Power factor ,AC power ,Motor–generator ,Energy storage ,law.invention ,law ,business - Abstract
The Brookhaven AGS is a strong focusing accelerator which is used to accelerate protons and various heavy ion species to equivalent maximum proton energy of 29 GeV. The AGS Main Magnet Power Supply (MMPS) is a thyristor control supply rated at 5500 Amps, +/-go00 Volts. The peak magnet power is 49.5 Mwatts. The power supply is fed from a motor/generator manufactured by Siemens. The motor is rated at 9 MW, input voltage 3 phase 13.8 KV 60 Hz. The generator is rated at 50 MVA its output voltage is 3 phase 7500 Volts. Thus the peak power requirements come from the stored energy in the rotor of the motor/generator. The rotor changes speed by about +/-2.5% of its nominal speed of 1200 Revolutions per Minute. The reason the power supply is powered by the Generator is that the local power company (LIPA) can not sustain power swings of +/- 50 MW in 0.5 sec if the power supply were to be interfaced directly with the AC lines. The Motor Generator is about 45 years old and Siemens is not manufacturing similar machines in the future. As a result we are looking at different ways of storing energy and being ablemore » to utilize it for our application. This paper will present simulations of a power supply where energy is stored in capacitor banks. The simulation program used is called PSIM Version 6.1. The control system of the power supply will also be presented. The average power from LIPA into the power supply will be kept constant during the pulsing of the magnets at +/-50 MW. The reactive power will also be kept constant below 1.5 MVAR. Waveforms will be presented.« less
- Published
- 2006
- Full Text
- View/download PDF