21 results on '"United States. Army. Corps of Engineers. Louisville District'
Search Results
2. Last of the old wicket dams: A history of Ohio River Locks and Dams 52 and 53, 1928-2018
- Author
-
Kryloff, Nicolai, Historical Research Associates, Inc.; United States. Army. Corps of Engineers. Louisville District, Kryloff, Nicolai, and Historical Research Associates, Inc.; United States. Army. Corps of Engineers. Louisville District
- Published
- 2023
3. U.S. Army Corps of Engineers, Ohio River Locks and Dams 52 and 53: Oral history collection
- Author
-
Kryloff, Nicolai, United States. Army. Corps of Engineers. Louisville District; Historical Research Associates, Inc., Kryloff, Nicolai, and United States. Army. Corps of Engineers. Louisville District; Historical Research Associates, Inc.
- Published
- 2022
4. Detailed project report with integrated environmental assessment: Continuing Authorities Program (CAP), Vermilion County, Illinois, Section 14 Emergency Streambank Stabilization Project
- Author
-
United States. Army. Corps of Engineers. Louisville District and United States. Army. Corps of Engineers. Louisville District
- Abstract
Detailed Project Report with Integrated Environmental Assessment Continuing Authorities Program (CAP) Vermilion County, Illinois Section 14 Emergency Streambank Stabilization Project Photo above is along Highway 21 at the erosion site in Vermilion County, Illinois (photo date February 2022) October 2022 PAGE INTENTIONALLY LEFT BLANK ii FINDING OF NO SIGNIFICANT IMPACT (FONSI) Continuing Authorities Program (CAP) Section 14 Emergency Streambank Stabilization Project Vermilion County, Illinois The U.S. Army Corps of Engineers (USACE), Louisville District conducted an environmental analysis in accordance with the National Environmental Policy Act of 1969 (42 U.S.C. §4321 et seq.), as amended. The Final Detailed Project Report, with Integrated Environmental Assessment (DPR/EA) dated September 2022, for the Continuing Authorities Program (CAP) Vermilion County, Illinois Section 14 Emergency Streambank Stabilization Project addresses potential environmental impacts associated with the stabilization of a bank section of the Middle Fork of the Vermilion River to protect County Highway 21 in Vermilion County, Illinois. The Final DPR/EA, incorporated herein by reference, evaluated various alternatives that would address emergency streambank erosion occurring on the bank of the Middle Fork of the Vermilion River. The Recommended Plan is the least costly alternative compared to the cost of relocating the threatened facility. The Recommended Plan includes re-grading the bank to a stable condition and placing an engineered mix of stone and soil with native plantings of riparian vegetation on the bank. In addition to a “no action” plan, six action alternatives were considered. The alternatives included: (1) vegetated riprap revetment (the Recommended Plan), (2) riprap and root wads revetment, (3) geocells revetment, (4) gabion baskets with erosion control matting, (5) soil encapsulated lifts, and (6) road relocation with new bridge construction. The alternatives are described in d
- Published
- 2022
5. Final, completion report: Former Nike SL-10 Launch Area, installation of five groundwater monitoring wells, Marine, Madison County, Illinois
- Author
-
United States. Army. Corps of Engineers. Louisville District; ERT, Inc. and United States. Army. Corps of Engineers. Louisville District; ERT, Inc.
- Abstract
FINAL COMPLETION REPORT FORMER NIKE SL-10 LAUNCH AREA INSTALLATION OF FIVE GROUNDWATER MONITORING WELLS, MARINE, MADISON COUNTY, ILLINOIS Contract No.: W912QR-12-D-0011 Delivery Order: 0002 Prepared for: Prepared by: ERT, Inc. 14401 Sweitzer Lane, Suite 300 Laurel, Maryland 20707 (301) 361-0620 September 2013 This page intentionally left blank Former Nike SL-10 Launch Area Final Completion Report September 2013 ERT, Inc. iii Final Completion Report Former Nike SL-10 Launch Area Installation of Five Groundwater Monitoring Wells, Marine, Madison County, Illinois Contract No.: W912QR-12-D-0011 Delivery Order: 0002 Prepared for: U.S. Army Corps of Engineers Louisville District Prepared by: ERT, Inc. 14401 Sweitzer Lane, Suite 300 Laurel, Maryland 20707 (301) 361-0620 Approvers: 25 September 2013 Jennifer Harlan, PMP Date Division Manager 24 September 2013 Brian P. McCarthy Date Project Manager Former Nike SL-10 Launch Area Final Completion Report September 2013 ERT, Inc. iv This page intentionally left blank Former Nike SL-10 Launch Area Final Completion Report September 2013 ERT, Inc. v COMPLETION OF SENIOR TECHNICAL REVIEW This document has been produced within the framework of the ERT, Inc. (ERT) and International Organization of Standardization Approved 9001-2008 quality management systems certification. As such, a senior technical review has been conducted. This included review of the overall design addressed within the document, proposed or utilized technologies and alternatives, and their applications with respect to project objectives and U.S. Army Corps of Engineers policy, regulatory guidance and constraints. Comments and concerns resulting from review of the document have been addressed and corrected, as necessary. 09 August 2013 Sean Carney, PMP Date Senior Technical Reviewer (ERT) COMPLETION OF INDEPENDENT TECHNICAL REVIEW This document has been produced within the framework of ERT’s quality management system. As such, an independent technical review, appro
- Published
- 2013
6. Former Nike SL-10 Launch Area, groundwater plume analysis, 2nd year report
- Author
-
United States. Army. Corps of Engineers. Louisville District and United States. Army. Corps of Engineers. Louisville District
- Abstract
Former Nike SL-10 Launch Area Groundwater Plume Analysis 2nd Year Report Prepared By: CELRL-ED-E February 2013 Groundwater Plume Analysis Final 2nd Year Report USACE Former Nike SL-10 GPA February 2013 Louisville District PAGE II TABLE OF CONTENTS Section & Title Page Number TABLE OF CONTENTS................................................................................................................II LIST OF ACRONYMS ................................................................................................................ IV LIST OF FIGURES ...................................................................................................................... VI LIST OF APPENDICES..............................................................................................................XII 1.0 OBJECTIVE, SCOPE, AND JUSTIFICTION....................................................................1 1.1 Objective ........................................................................................................................1 1.2 Scope.............................................................................................................................1 1.3 Justification...................................................................................................................1 2.0 BACKGROUND .................................................................................................................2 2.1 Site Description..............................................................................................................2 2.2 Site Location ..................................................................................................................2 2.3 Topography....................................................................................................................2 2.4 Geology.........................................................................................................................2 2.5 Hydrogeol
- Published
- 2013
7. Final, completion report: Former Nike SL-10 Launch Area, installation of five groundwater monitoring wells, Marine, Madison County, Illinois
- Author
-
United States. Army. Corps of Engineers. Louisville District; ERT, Inc. and United States. Army. Corps of Engineers. Louisville District; ERT, Inc.
- Abstract
FINAL COMPLETION REPORT FORMER NIKE SL-10 LAUNCH AREA INSTALLATION OF FIVE GROUNDWATER MONITORING WELLS, MARINE, MADISON COUNTY, ILLINOIS Contract No.: W912QR-12-D-0011 Delivery Order: 0002 Prepared for: Prepared by: ERT, Inc. 14401 Sweitzer Lane, Suite 300 Laurel, Maryland 20707 (301) 361-0620 September 2013 This page intentionally left blank Former Nike SL-10 Launch Area Final Completion Report September 2013 ERT, Inc. iii Final Completion Report Former Nike SL-10 Launch Area Installation of Five Groundwater Monitoring Wells, Marine, Madison County, Illinois Contract No.: W912QR-12-D-0011 Delivery Order: 0002 Prepared for: U.S. Army Corps of Engineers Louisville District Prepared by: ERT, Inc. 14401 Sweitzer Lane, Suite 300 Laurel, Maryland 20707 (301) 361-0620 Approvers: 25 September 2013 Jennifer Harlan, PMP Date Division Manager 24 September 2013 Brian P. McCarthy Date Project Manager Former Nike SL-10 Launch Area Final Completion Report September 2013 ERT, Inc. iv This page intentionally left blank Former Nike SL-10 Launch Area Final Completion Report September 2013 ERT, Inc. v COMPLETION OF SENIOR TECHNICAL REVIEW This document has been produced within the framework of the ERT, Inc. (ERT) and International Organization of Standardization Approved 9001-2008 quality management systems certification. As such, a senior technical review has been conducted. This included review of the overall design addressed within the document, proposed or utilized technologies and alternatives, and their applications with respect to project objectives and U.S. Army Corps of Engineers policy, regulatory guidance and constraints. Comments and concerns resulting from review of the document have been addressed and corrected, as necessary. 09 August 2013 Sean Carney, PMP Date Senior Technical Reviewer (ERT) COMPLETION OF INDEPENDENT TECHNICAL REVIEW This document has been produced within the framework of ERT’s quality management system. As such, an independent technical review, appro
- Published
- 2013
8. Former Nike SL-10 Launch Area, groundwater plume analysis, 2nd year report
- Author
-
United States. Army. Corps of Engineers. Louisville District and United States. Army. Corps of Engineers. Louisville District
- Abstract
Former Nike SL-10 Launch Area Groundwater Plume Analysis 2nd Year Report Prepared By: CELRL-ED-E February 2013 Groundwater Plume Analysis Final 2nd Year Report USACE Former Nike SL-10 GPA February 2013 Louisville District PAGE II TABLE OF CONTENTS Section & Title Page Number TABLE OF CONTENTS................................................................................................................II LIST OF ACRONYMS ................................................................................................................ IV LIST OF FIGURES ...................................................................................................................... VI LIST OF APPENDICES..............................................................................................................XII 1.0 OBJECTIVE, SCOPE, AND JUSTIFICTION....................................................................1 1.1 Objective ........................................................................................................................1 1.2 Scope.............................................................................................................................1 1.3 Justification...................................................................................................................1 2.0 BACKGROUND .................................................................................................................2 2.1 Site Description..............................................................................................................2 2.2 Site Location ..................................................................................................................2 2.3 Topography....................................................................................................................2 2.4 Geology.........................................................................................................................2 2.5 Hydrogeol
- Published
- 2013
9. Falls City engineer
- Author
-
United States. Army. Corps of Engineers. Louisville District and United States. Army. Corps of Engineers. Louisville District
- Published
- 2009
10. Falls City engineer
- Author
-
United States. Army. Corps of Engineers. Louisville District and United States. Army. Corps of Engineers. Louisville District
- Published
- 2009
11. Report of findings, former Nike SL-10 Launch Area, natural attenuation evaluation, Marine, Illinois
- Author
-
United States. Army. Corps of Engineers. Louisville District; GEO Consultants, LLC and United States. Army. Corps of Engineers. Louisville District; GEO Consultants, LLC
- Abstract
GEO/08-160 Final U.S. Army Corps of Engineers Louisville District Report of Findings Former Nike SL-10 Launch Area Natural Attenuation Evaluation Marine, Illinois Prepared for U.S. Army Corps of Engineers Louisville District Contract No. W912QR-04-D-0030 Delivery Order 0018 Prepared by GEO Consultants, LLC 199 Kentucky Avenue Kevil, Kentucky 42053 August 2008 GEO/08-160 Final Report of Findings Former Nike SL-10 Launch Area Natural Attenuation Evaluation Marine, Illinois Date Issued – August 2008 Prepared by GEO Consultants, LLC Kevil, KY Under subcontract W912QR-04-D-0030 Delivery Order No. 0018 Prepared for the U.S. Army Corps of Engineers Louisville District 600 Martin Luther King, Jr. Place Louisville, Kentucky 40202-2232 CONTRACTOR STATEMENT OF INDEPENDENT TECHNICAL REVIEW GEO Consultants, LLC (GEO) has completed the Report of Findings for the Former Nike SL-10 Natural Attenuation Evaluation in Marine, Illinois. Notice is hereby given that an independent technical review has been conducted that is appropriate to the level of risk and complexity inherent in the project as defined in GEO’s Corporate Quality Control Plan. During the independent technical review, compliance with established policy, principles and procedures, using justified and valid assumptions, was verified. This included review of technical scope, assumptions, technical methods, procedures, and materials used in analyses, appropriateness of data, reasonableness of results, including whether the product meets the customer’s needs consistent with the law and existing Corps policy. 8/5/08 Todd Calhoun, P.G. Independent Technical Review Team Leader Date 8/5/08 Larry Copeland Independent Technical Review Team Member Date 8/5/08 Kim Morris Quality Program Manager Date Significant concerns and the explanation of the resolution are as follows: None As noted above, all concerns resulting from the independent technical review of the project have been considered. 8/5/08 Jeff Douthitt, P.E. President, GEO C
- Published
- 2008
12. Report of findings, former Nike SL-10 Launch Area, natural attenuation evaluation, Marine, Illinois
- Author
-
United States. Army. Corps of Engineers. Louisville District; GEO Consultants, LLC and United States. Army. Corps of Engineers. Louisville District; GEO Consultants, LLC
- Abstract
GEO/08-160 Final U.S. Army Corps of Engineers Louisville District Report of Findings Former Nike SL-10 Launch Area Natural Attenuation Evaluation Marine, Illinois Prepared for U.S. Army Corps of Engineers Louisville District Contract No. W912QR-04-D-0030 Delivery Order 0018 Prepared by GEO Consultants, LLC 199 Kentucky Avenue Kevil, Kentucky 42053 August 2008 GEO/08-160 Final Report of Findings Former Nike SL-10 Launch Area Natural Attenuation Evaluation Marine, Illinois Date Issued – August 2008 Prepared by GEO Consultants, LLC Kevil, KY Under subcontract W912QR-04-D-0030 Delivery Order No. 0018 Prepared for the U.S. Army Corps of Engineers Louisville District 600 Martin Luther King, Jr. Place Louisville, Kentucky 40202-2232 CONTRACTOR STATEMENT OF INDEPENDENT TECHNICAL REVIEW GEO Consultants, LLC (GEO) has completed the Report of Findings for the Former Nike SL-10 Natural Attenuation Evaluation in Marine, Illinois. Notice is hereby given that an independent technical review has been conducted that is appropriate to the level of risk and complexity inherent in the project as defined in GEO’s Corporate Quality Control Plan. During the independent technical review, compliance with established policy, principles and procedures, using justified and valid assumptions, was verified. This included review of technical scope, assumptions, technical methods, procedures, and materials used in analyses, appropriateness of data, reasonableness of results, including whether the product meets the customer’s needs consistent with the law and existing Corps policy. 8/5/08 Todd Calhoun, P.G. Independent Technical Review Team Leader Date 8/5/08 Larry Copeland Independent Technical Review Team Member Date 8/5/08 Kim Morris Quality Program Manager Date Significant concerns and the explanation of the resolution are as follows: None As noted above, all concerns resulting from the independent technical review of the project have been considered. 8/5/08 Jeff Douthitt, P.E. President, GEO C
- Published
- 2008
13. Nike SL-10 Launch Area, Groundwater Remedial Investigation/Feasibility Study/Proposed Plan/Record of Decision Project, Marine, Illinois: Remedial investigation report
- Author
-
United States. Army. Corps of Engineers. Louisville District; Plexus Scientific Corporation and United States. Army. Corps of Engineers. Louisville District; Plexus Scientific Corporation
- Abstract
NIKE SL-10 LAUNCH AREA GROUNDWATER REMEDIAL INVESTIGATION/FEASIBILITY STUDY/ PROPOSED PLAN/RECORD OF DECISION PROJECT MARINE, ILLINOIS REMEDIAL INVESTIGATION REPORT Final Rev 0 November 2005 Prepared for U.S. ARMY CORPS OF ENGINEERS, LOUISVILLE DISTRICT Contract Number: DACA27-98-D-0031 Delivery Order 0008 Prepared by Plexus Scientific Corporation 1900 N. Beauregard Street, Suite 300 Alexandria, Virginia 22311 Printed on Recycled Paper 200.1e E05IL008105_03.10_0002_a 200.1e USACE Louisville District Nike SL-10 Launch Area Groundwater RI/FS/PP/ROD Project Final RI Report – 11/05 Page i CONTRACTOR STATEMENT OF TECHNICAL REVIEW Plexus Scientific Corporation has completed this Remedial Investigation Report for the Nike SL- 10 Launch Area Groundwater Remedial Investigation/Feasibility Study/Proposed Plan/Record of Decision project. Notice is hereby given that an independent technical review has been conducted that is appropriate to the level of risk and complexity inherent in the project, as defined in the Quality Control Plan. During the independent technical review, it was established that policy principles and procedures, utilizing justified and valid assumptions, were complied with in preparation of this Remedial Investigation Report. This included review of assumptions; methods, procedures, and material used in analyses; alternatives evaluated; the appropriateness of data used and level of data obtained; and reasonableness of the results, including whether the product meets the customer's needs consistent with law and existing U.S. Army Corps of Engineers’ policy. Review documentation identifying any specific concerns identified during the technical review and their resolution is maintained in the project file. November 21, 2005 Bill Millar Project Manager Date November 21, 2005 Bill Rainey Independent Technical Review Team Date 200.1e E05IL008105_03.10_0002_a 200.1e USACE Louisville District Nike SL-10 Launch Area Groundwater RI/FS/PP/ROD Project Final RI Report –
- Published
- 2005
14. Nike SL-10 Launch Area, Groundwater Remedial Investigation/Feasibility Study/Proposed Plan/Record of Decision Project, Marine, Illinois: Remedial investigation report
- Author
-
United States. Army. Corps of Engineers. Louisville District; Plexus Scientific Corporation and United States. Army. Corps of Engineers. Louisville District; Plexus Scientific Corporation
- Abstract
NIKE SL-10 LAUNCH AREA GROUNDWATER REMEDIAL INVESTIGATION/FEASIBILITY STUDY/ PROPOSED PLAN/RECORD OF DECISION PROJECT MARINE, ILLINOIS REMEDIAL INVESTIGATION REPORT Final Rev 0 November 2005 Prepared for U.S. ARMY CORPS OF ENGINEERS, LOUISVILLE DISTRICT Contract Number: DACA27-98-D-0031 Delivery Order 0008 Prepared by Plexus Scientific Corporation 1900 N. Beauregard Street, Suite 300 Alexandria, Virginia 22311 Printed on Recycled Paper 200.1e E05IL008105_03.10_0002_a 200.1e USACE Louisville District Nike SL-10 Launch Area Groundwater RI/FS/PP/ROD Project Final RI Report – 11/05 Page i CONTRACTOR STATEMENT OF TECHNICAL REVIEW Plexus Scientific Corporation has completed this Remedial Investigation Report for the Nike SL- 10 Launch Area Groundwater Remedial Investigation/Feasibility Study/Proposed Plan/Record of Decision project. Notice is hereby given that an independent technical review has been conducted that is appropriate to the level of risk and complexity inherent in the project, as defined in the Quality Control Plan. During the independent technical review, it was established that policy principles and procedures, utilizing justified and valid assumptions, were complied with in preparation of this Remedial Investigation Report. This included review of assumptions; methods, procedures, and material used in analyses; alternatives evaluated; the appropriateness of data used and level of data obtained; and reasonableness of the results, including whether the product meets the customer's needs consistent with law and existing U.S. Army Corps of Engineers’ policy. Review documentation identifying any specific concerns identified during the technical review and their resolution is maintained in the project file. November 21, 2005 Bill Millar Project Manager Date November 21, 2005 Bill Rainey Independent Technical Review Team Date 200.1e E05IL008105_03.10_0002_a 200.1e USACE Louisville District Nike SL-10 Launch Area Groundwater RI/FS/PP/ROD Project Final RI Report –
- Published
- 2005
15. Final report: Pilot-scale Treatability Study, former Nike Missile SL-10 Launch Area, Marine, Illinois
- Author
-
United States. Army. Corps of Engineers. Louisville District; Law Engineering and Environmental Services, Inc. and United States. Army. Corps of Engineers. Louisville District; Law Engineering and Environmental Services, Inc.
- Abstract
E051LOO8105 040- FINAL REPORT PILOT-SCALE TREATABILITY STUDY FORMER NIKE MISSILE SL-10 LAUNCH AREA MARINE, ILLINOIS Prepared for: U.S. ARMY CORPS OF ENGINEERS LOUISVILLE DISTRICT Louisville, Kentucky Prepared by: LAW ENGINEERING AND ENVIRONMENTAL SERVICES, INC. Louisville, Kentucky May 1999 200.1e E05IL008105_04.09_0002_a 200.1e Final Report for Pilot-Scale Treatability Study LAWProject 50521-?-3003 TABLE OF CONTENTS May 4, 1999 Page LIST OF TABLES . . . ... . . .. . ... . . .... . .... . . . ... . . ... . . .. . . ... . . ... . .. . ... . .. . ... . . .. . .. .. . . .... . ... . . ... . . .. . . .. . . . .. . . .. . . ... . ... . ... . ... . . IV LIST OF FIGURES . . ... . . .. . . .. . . . .... . . ... . . ... . . .... . ... . . .. . . ... . .. . ... . .. . . ... . ... . . ... . .... . ... . . . ... . ... . . .. . . ... . .... . ... . .. . ... . ... . .. v EXECUTIVE SUMMARY . . . . .... . . .... . ... . . . ... . ... . . ... . .... ... . .. . .... ... . . .. . . .... .... . . .. . . . .... .... . ... . .... .... . ... . ... ... . ... . . vi 1 .0 INTRODUCTION.. .... . .. . . .... . . .... . . ... . . .... .... . ... . .... ... . ... .... .... . ... . .... . .... . . ... . .... .... . ... . .... .... . ... . ... . ... . .. . . . 1 1 .1 PROJECT OBJECTIVES/OVERALL SCOPE OF WORK. ... . . ... . .... . ... . ... . .... . ... . ... . ... . ... . ... . . 3 1 .2 SITE LOCATION AND GEOLOGY . . ... . ... .... . .. . ... .... . ... . . ... . . .... . ... . . ... . ... . ... . . ... . ... . ... . .... ... . . .. . . 4 2.0 CONTAMINANT DISTRIBUTION DESCRIPTION . ... . .... . . .. . . .... . ... . . .... . .. . . ... . ... . . .. . . ... . ... .... . .. . . 5 2.1 SOIL ANALYTICAL RESULTS . . . .. . . . ... . .. . ... . ... . .. . . .. . .... . . ... . .... . .... . . ... . .. . . ... . . .. . . .. . . .. . . ... .... . .. . . 6 2.2 GROUNDWATER ANALYTICAL RESULTS .. . ... . . ... . . ... . .... . ..... . ... . ... . . ... . .. . . ... . . .. . ... .... . ... . 6 3 .0 DEFINITION OF CLE
- Published
- 1999
16. Final report: Pilot-scale Treatability Study, former Nike Missile SL-10 Launch Area, Marine, Illinois
- Author
-
United States. Army. Corps of Engineers. Louisville District; Law Engineering and Environmental Services, Inc. and United States. Army. Corps of Engineers. Louisville District; Law Engineering and Environmental Services, Inc.
- Abstract
E051LOO8105 040- FINAL REPORT PILOT-SCALE TREATABILITY STUDY FORMER NIKE MISSILE SL-10 LAUNCH AREA MARINE, ILLINOIS Prepared for: U.S. ARMY CORPS OF ENGINEERS LOUISVILLE DISTRICT Louisville, Kentucky Prepared by: LAW ENGINEERING AND ENVIRONMENTAL SERVICES, INC. Louisville, Kentucky May 1999 200.1e E05IL008105_04.09_0002_a 200.1e Final Report for Pilot-Scale Treatability Study LAWProject 50521-?-3003 TABLE OF CONTENTS May 4, 1999 Page LIST OF TABLES . . . ... . . .. . ... . . .... . .... . . . ... . . ... . . .. . . ... . . ... . .. . ... . .. . ... . . .. . .. .. . . .... . ... . . ... . . .. . . .. . . . .. . . .. . . ... . ... . ... . ... . . IV LIST OF FIGURES . . ... . . .. . . .. . . . .... . . ... . . ... . . .... . ... . . .. . . ... . .. . ... . .. . . ... . ... . . ... . .... . ... . . . ... . ... . . .. . . ... . .... . ... . .. . ... . ... . .. v EXECUTIVE SUMMARY . . . . .... . . .... . ... . . . ... . ... . . ... . .... ... . .. . .... ... . . .. . . .... .... . . .. . . . .... .... . ... . .... .... . ... . ... ... . ... . . vi 1 .0 INTRODUCTION.. .... . .. . . .... . . .... . . ... . . .... .... . ... . .... ... . ... .... .... . ... . .... . .... . . ... . .... .... . ... . .... .... . ... . ... . ... . .. . . . 1 1 .1 PROJECT OBJECTIVES/OVERALL SCOPE OF WORK. ... . . ... . .... . ... . ... . .... . ... . ... . ... . ... . ... . . 3 1 .2 SITE LOCATION AND GEOLOGY . . ... . ... .... . .. . ... .... . ... . . ... . . .... . ... . . ... . ... . ... . . ... . ... . ... . .... ... . . .. . . 4 2.0 CONTAMINANT DISTRIBUTION DESCRIPTION . ... . .... . . .. . . .... . ... . . .... . .. . . ... . ... . . .. . . ... . ... .... . .. . . 5 2.1 SOIL ANALYTICAL RESULTS . . . .. . . . ... . .. . ... . ... . .. . . .. . .... . . ... . .... . .... . . ... . .. . . ... . . .. . . .. . . .. . . ... .... . .. . . 6 2.2 GROUNDWATER ANALYTICAL RESULTS .. . ... . . ... . . ... . .... . ..... . ... . ... . . ... . .. . . ... . . .. . ... .... . ... . 6 3 .0 DEFINITION OF CLE
- Published
- 1999
17. Final environmental impact statement: Clark Maritime Centre, Jeffersonville, Clark County, Indiana, Ohio River, mile 597
- Author
-
United States. Army. Corps of Engineers. Louisville District and United States. Army. Corps of Engineers. Louisville District
- Abstract
FINALENVIRONMENTAL IMPACTSTATEMENT Clark MaritimeCentreJEFFERSONVILLECLARK COVNTV, INDIANA OHIO RIVEft MILE 597 prepared byU.S. Avmy Corps* Of Engineers Louisville District. KentuckyFINALENVIRONMENTAL IMPACT STATEMENT CLARK MARITIME CENTRE JEFFERSONVILIE, CLARK COUNTY, INDIANA OHIO RIVER, MILE 597 Prepared ByU.S. Amy Corps of Engineers Louisville District Kentucky February 1977FINALENVIRONMENTAL IMPACT STATEMENT CLARK MARITIME CENTRE JEFFERSONVILLE, CLARK COUNTY, INDIANA TABLE OF CONTENTS Section Title Page FOREWORD a SUMMARY b 1 PROJECT DESCRIPTION 1-1 Location 1-1 History 1-1 Authorizing Law 1-5 General Plan 1-5 Land Use 1-5 Developmental Policy 1-6 Industrial Park 1-7 Port Facilities 1-8 Water Activity 1-10 Transportation 1-12 Utilities 1-12 Development Schedules 1-14 Property Acquisitions To Date 1-14 Development Phasing 1-15 Capital Budget For Phase I Development 1-16 Port Administration 1-18 Project Status 1-18 Planning 1-18 Engineering 1-18 Architectural Design 1-19 2 ENVIRONMENTAL SETTING WITHOUT THE PROJECT 2-1 Introduction 2-1 Physical Aspects 2-1 Land Use 2-1 Climate 2-3Air Quality 2-4 Noise Quality 2-7 Geology 2-8 Soils 2-32 Groundwater 2-42 Hydrology 2-44 Water Quality 2-58 Biological Aspects of the Study Area 2-77 Terrestrial Aspects 2-77 Aquatic Aspects 2-94 Social Characteristics 2-109 Population 2-109 Housing 2-118 Recreation 2-124 Public Facilities 2-127 Archaeology 2-129 Historical 2-138 Aesthetics 2-141 Attitudes 2-142 Economic Indicators 2-148 Income 2-148 Employment Characteristics 2-151 Employment Distribution . 2-157 Investment 2-157 Transportation 2-161 Transportation To Work 2-161 Utilities 2-166 3 RELATIONSHIP TO OTHER LAND USE PLANS AND PROJECTS 3-1 Local 3-1 State and Federal 3-2 Public Involvement 3-2 4 ENVIRONMENTAL IMPACT OF THE PROPOSED ACTION 4-1 Introduction 4-1 Physical Aspects 4-1 Land Use 4-1 Climate 4-2Air Quality 4-3 Noise Quality 4-5 Geology 4.5 Groundwater 4-7 Hydrology 4-8 Water Quality 4-10A Biological Aspects of the Study
- Published
- 1977
18. Draft feasibility report: Southwest Ohio, Fairfield water resources development
- Author
-
United States. Army. Corps of Engineers. Louisville District and United States. Army. Corps of Engineers. Louisville District
- Abstract
• -- Draft Feasibility I z_oqg_D . ! . . 11 L> . · HUB;~~ Report /1~\ i ilGi , . :., :~I I • 1 'l, Li\11_ ·10 I.\ ( Main Report &~ _c-· Q_L. .JL,J.,hd~ •,~; 1 2 l o ·- FAIRFIELD-- Water Southwest Ohio ·• · :Resources - Development October 1981 -·--• ·. . .) ;·.~ . ··· . · . . :. •,,,··.r.,:· .•:•·:. t · '· ,·· ,- . . . . . .. INTERl~ · REPORT; FOi:t . . ; · ... · •. '.ii;t:<)~f~~ll.i_ ~E8,9llRCf_S DEVELOP11ENT•_ . _ " ' _-=ll' MlAMI RIVER, L-ITTLE. MIAMI RIVER' :: :.,;::-::; AN'h: ~.HLL CREEk BASINS . =:\~}f~ .. -)~.-: .'·' . ·-· ,,: ,- - ·. SOUTHWEST OHIO ·;. ~tUdY t o petemtnc the· ~e ~~ibility =_ of P"t"ovtdJng Flood Control ai,d Related Wate-r 11e·sour ces IcproVements 1Jl t he Pl_ea sant 1tUri · 8asi~, Obio · Volume . 1 of . 2 Oc tober 1913 1 • SYLLABPS The purpose of this interim report is to present the findings of a study concerning water resources development in the vicinity of Fairfield, Ohio. The study was undertaken "as a part of the Miami River, Little Miami River, and Mill Creek Basins, ·ohio Survey Investigation. Other water resources studies concerning Southwest Ohio will be reported on in subsequent interim and final reports. The study includes consideration of water resOurces along Pleasant Run Creek and its tributaries--High School Tributary, General Motors Ditch, and East Fork Tributary. The study area includes the City of Fairfield located in Butler County and the upper reaches of Pleasant Run Creek located in extreme northern Hamilton County. The significant identified water and related land resoutces problems and opportunities in the study area are the direct result of flooding and urban expansion. The most serious problems at'e caused by headwater flooding on the reaches of Pleasant Run Creelt between Nilles Road and East Fork Tributary. The flooding on the Great Miami River does not cause significant problems within the study area. Additional outdoor recreation and open space needs exist and opportunities exist for their realization in conju
- Published
- 1981
19. Clarence J. Brown Reservoir, greater Miami River Basin, Ohio: Embankment criteria and performance report
- Author
-
United States. Army. Corps of Engineers. Louisville District and United States. Army. Corps of Engineers. Louisville District
- Abstract
GRATR MAM RNER BS EMANKMENT CRITERIA AND PERFORMANCE REPORT D PRIOAKj BY ~~wos cjE, 64STWiCTuOWm DEPARTMENT OF THE ARMY LOUISVILLE DISTRICT, CORPS OF ENGINEERS P.O. Box 59 LOUISVILLE, KENTUCKY 40201 ORLED-G 9 December 1982 SUBJECT: Embankment Criteria and Performance Report C. J. Brown Reservoir, Ohio SEE DISTRIBUTION In accordance with Paragraph 8 of ER 1110-2-1901, dated 31 December 1981, we are inclosing subject report for your information and file. FOR THE COMMANDER: 1 Incl WH I as Chief, Engineering Division DISTRIBUTION: US Army Eng Div, Pacific Ocean US Army Eng Dist, Portland US Army Eng Div, Lower Miss Valley US Army Eng Dist, Seattle US Army Eng Dist, Memphis US Army Eng Dist, Walls Walla US Army Eng Dist, New Orleans US Army Eng Div, Ohio River US Army Eng Dist, St. Louis US Army Eng Dist, Huntington US Army Eng Dist, Vicksburg US Army Eng Dist, Savannah US Army Eng Div, South Atlantic US Army Eng Dist, Na .hville US Army Eng Div, Missouri River US Army Eng Diet, Pittsburgh US Army Eng Dist, Kansas City US Army Eng Div, South Pacific US Army Eng Dist, Omaha US Army Eng Diet, Los Angeles US Army Eng Div, New England US Army Eng Diet, Sacramento US Army Eng Div, N. Atlantic US Army Eng Dist, San Francisco US Army Eng Diet, Baltimore US Army Eng Div, Southwestern US Army Eng Diet, New York US Army Eng Dist, Albuquerque US Army Eng Dist, Norfolk US Army Eng Dist, Fort Worth US Army Ing Diet, Philadelphia US Army Eng Dist, Galveston US Army Ing Div, North Central US Army Eng Dist, Little Rock US Army Ing Diet, Buffalo US Army Eng Diet, Tulsa US Army Eng Diet, Chicago US Army Eng Waterways Experiment Sta.(5 cys) US Army Ing Diet, Detroit DAEN-CWE-SS (2 cye) US Amy Ing Diet, Rock Island DAEN-ASI-P (2 cys) US Army Zug Diet, Ste Paul C. J. Brown Reservoir Project Office US Army Eng Div, North Pacific US Army Eng Diet, Jacksonville US Army Zug Dist, Alaska US Army Ing Dist, Mobile US Army Zug Diet, Charleston US Army En Diet, Wilmington Miami River Area Office DTIC
- Published
- 1982
20. Interim report for water resources development, Miami River, Little Miami River, and Mill Creek Basins, Southwest Ohio: A study to determine the feasibility of providing flood control and related water resources improvements in the Holes Creek Basin, Ohio
- Author
-
United States. Army. Corps of Engineers. Louisville District and United States. Army. Corps of Engineers. Louisville District
- Abstract
• lNTERIM REPORT FOR WATER RESOURCES DEVELOPMENT MIAMI RI,VER, LITTLE MIAMI RIVER, ANO HILL CREEK BASINS, c· SOUTHMEST OH.IO A STUDY TO [)ET&RMlNl 'rHE F'EASI81LITY Of PROVIDING FLOOD CONTROL AIID RELATED WA'l'ER R.ESOllRCtS IMPROVEMENTS IN TEIE HOL&S CR.£&K BASIN, OHIO SEP'!BMBER 1980 • Syllabus 'fhe purpose ·of t his inter ill report i& to present the .findings of a study· conce rning w-a ter -resource d evelopment in .the v 1c1nity of ·weet Canolll::on, Ohio. ~e study was undertaken as a par t of. the Miaid. Ri~er, Little Miami Riv e r, ~nd Mill Creen B~si.ne, Ohio s ur:Y@y Investigation. Ot her·ws.ter · resource studi es cOncerni ng SOUtbweat Ohio \,fill be reported on 1n subsequent interim and final nports. The s t udy a ru ~s l ocat ed o o the l elt ban~ of t h e ~a11.i Ri 'vet' 1 e~th of 'Dayton and in Mont gomery County, Qhio. The s t\ldy_ar~a incl1:1dea the .Ci_tY of · West Ca rro llton and portion• of the Cit:)' of Morai~e. ·w1mt TOW11Ship and Washington Township. Two tribi.Jr&ry str eams, · Owl Cr.eek -&n"d Hoie~ Creek7 flo~ t hrough t !".a study ·aree. and e nter t he Mial Ri'le.t .in the _v1cintty of We Gt Carrollton. The s1&:n1fi~an t un r esolved w.ter an~ _ril at~d- lao4 resou-rces problms i n_ the. atudy 11.rea are t he direc t :reBull:-•of. £10,;,diD&>-.Th•. ·most se~iou·a ptobhru a re c•used by headwater n oodtng_ o~ t~e l~~-- ~ea~h~-• i~ ·_o.,'1 and ~01es C~~'ca:, . u pecial_ly Holes Cre.ek.. The largltr"-: ·npod s '-:~~ ·ch·e _ ·Mi~ffl.1· Ri'."er ~ls_Q ~:au~e problems 0~ the lowe~ r~c·h~~ ·ot ~·; t b :~~e-eks> '."Tb~ -~~:1 :eo~,-~·r~t'-~y-, dt·s ~~i~~ :. has constructed le"'?ees. alon.a- che';~~~~t"-Riv_er·: to·.-~~e-~in.~ · c:v:~t~~~-:_tl9.od1~i ·br· ... · ·. -
- Published
- 1980
21. Final environmental impact statement: Clark Maritime Centre, Jeffersonville, Clark County, Indiana, Ohio River, mile 597
- Author
-
United States. Army. Corps of Engineers. Louisville District and United States. Army. Corps of Engineers. Louisville District
- Abstract
FINALENVIRONMENTAL IMPACTSTATEMENT Clark MaritimeCentreJEFFERSONVILLECLARK COVNTV, INDIANA OHIO RIVEft MILE 597 prepared byU.S. Avmy Corps* Of Engineers Louisville District. KentuckyFINALENVIRONMENTAL IMPACT STATEMENT CLARK MARITIME CENTRE JEFFERSONVILIE, CLARK COUNTY, INDIANA OHIO RIVER, MILE 597 Prepared ByU.S. Amy Corps of Engineers Louisville District Kentucky February 1977FINALENVIRONMENTAL IMPACT STATEMENT CLARK MARITIME CENTRE JEFFERSONVILLE, CLARK COUNTY, INDIANA TABLE OF CONTENTS Section Title Page FOREWORD a SUMMARY b 1 PROJECT DESCRIPTION 1-1 Location 1-1 History 1-1 Authorizing Law 1-5 General Plan 1-5 Land Use 1-5 Developmental Policy 1-6 Industrial Park 1-7 Port Facilities 1-8 Water Activity 1-10 Transportation 1-12 Utilities 1-12 Development Schedules 1-14 Property Acquisitions To Date 1-14 Development Phasing 1-15 Capital Budget For Phase I Development 1-16 Port Administration 1-18 Project Status 1-18 Planning 1-18 Engineering 1-18 Architectural Design 1-19 2 ENVIRONMENTAL SETTING WITHOUT THE PROJECT 2-1 Introduction 2-1 Physical Aspects 2-1 Land Use 2-1 Climate 2-3Air Quality 2-4 Noise Quality 2-7 Geology 2-8 Soils 2-32 Groundwater 2-42 Hydrology 2-44 Water Quality 2-58 Biological Aspects of the Study Area 2-77 Terrestrial Aspects 2-77 Aquatic Aspects 2-94 Social Characteristics 2-109 Population 2-109 Housing 2-118 Recreation 2-124 Public Facilities 2-127 Archaeology 2-129 Historical 2-138 Aesthetics 2-141 Attitudes 2-142 Economic Indicators 2-148 Income 2-148 Employment Characteristics 2-151 Employment Distribution . 2-157 Investment 2-157 Transportation 2-161 Transportation To Work 2-161 Utilities 2-166 3 RELATIONSHIP TO OTHER LAND USE PLANS AND PROJECTS 3-1 Local 3-1 State and Federal 3-2 Public Involvement 3-2 4 ENVIRONMENTAL IMPACT OF THE PROPOSED ACTION 4-1 Introduction 4-1 Physical Aspects 4-1 Land Use 4-1 Climate 4-2Air Quality 4-3 Noise Quality 4-5 Geology 4.5 Groundwater 4-7 Hydrology 4-8 Water Quality 4-10A Biological Aspects of the Study
- Published
- 1977
Catalog
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.