Search

Your search keyword '"Fanale, F."' showing total 125 results

Search Constraints

Start Over You searched for: Author "Fanale, F." Remove constraint Author: "Fanale, F." Search Limiters Available in Library Collection Remove constraint Search Limiters: Available in Library Collection
125 results on '"Fanale, F."'

Search Results

7. Status and future development of Heating and Current Drive for the EU DEMO

9. Progress of DTT ECRH system design

10. Integration concept of an Electron Cyclotron System in DEMO

12. Recent experiments with the European 1MW, 170GHz industrial CW and short-pulse gyrotrons for ITER

13. Tests and developments of a long-pulse high-power 170 GHz absorbing matched load

14. Design Progress of Structural Components of the EU DEMO EC Equatorial Launcher

15. Status of DTT ECH Transmission Lines and Antennae

19. Near-Infrared Spectroscopy and Spectral Mapping of Jupiter and the Galilean Satellites: Results from Galileo's Initial Orbit

20. Galileo's First Images of Jupiter and the Galilean Satellites

22. Progress of DTT ECRH system design

24. Galileo Infrared Imaging Spectroscopy Measurements at Venus

25. Galileo Encounter with 951 Gaspra: First Pictures of an Asteroid

26. Galileo Multispectral Imaging of the North Polar and Eastern Limb Regions of the Moon

27. First Images of Asteroid 243 Ida

30. Experimental Results of the EU ITER Prototype Gyrotrons

31. Integration concept of an Electron Cyclotron System in DEMO

32. Tests and developments of a long-pulse high-power 170 GHz absorbing matched load

33. Overview of the FTU results

34. EU DEMO EC equatorial launcher pre-conceptual performance studies

35. Operations with Spherical Calorimetric Loads in Different Configurations at Gyrotron Test Stands at EPFL and QST

36. Operations with spherical calorimetric loads in different configurations at gyrotron test stands at EPFL and QST

38. Tests and developments of a long-pulse high-power 170 GHz absorbing matched load

39. Recent experiments with the European 1MW, 170GHz industrial CW and short-pulse gyrotrons for ITER

40. DTT - Divertor Tokamak Test facility - Interim Design Report

41. Recent progress in the development of the European 1 MW, 170 GHz CW gyrotron for ITER

42. Long-pulse high-power 170 GHz absorbing matched load tests and developments

43. Recent experiments with the European 1 MW, 170 GHz industrial CW and modular SP prototype gyrotron for ITER

Catalog

Books, media, physical & digital resources