Search

Your search keyword '"Appa Iyer Sivakumar"' showing total 27 results

Search Constraints

Start Over You searched for: Author "Appa Iyer Sivakumar" Remove constraint Author: "Appa Iyer Sivakumar" Topic business Remove constraint Topic: business
27 results on '"Appa Iyer Sivakumar"'

Search Results

1. Bi-criteria Convoy Movement Problem

2. An efficient new job release control methodology

3. Impact of Production Control and System Factors in Semiconductor Wafer Fabrication

4. Cycle time variance minimization in dynamic scheduling of single machine systems

5. Controlling delivery performance in semiconductor manufacturing using Look Ahead Batching

6. Scheduling rules to achieve lead-time targets in outpatient appointment systems

7. Optimization of due-date objectives in scheduling semiconductor batch manufacturing

8. Online Multiobjective Pareto Optimal Dynamic Scheduling of Semiconductor Back-End Using Conjunctive Simulated Scheduling

9. Synchronized scheduling of assembly and multi-destination air-transportation in a consumer electronics supply chain

10. Job shop scheduling techniques in semiconductor manufacturing

11. Single machine scheduling with multiple objectives in semiconductor manufacturing

12. A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing

13. A network flow approach for tactical resource planning in outpatient clinics

14. Synchronized Scheduling of Manufacturing and 3PL Transportation

15. Cycle time reduction at cluster tool in semiconductor wafer fabrication

16. Job release based on WIPLOAD control in semiconductor wafer fabrication

17. Hot lot management: minimizing cycle time in batch processes

18. Dynamic bi-objective Pareto-schedule generation and control in semiconductor supply chain

19. Simulation based scheduling using a two-pass approach

20. Simulation-based scheduling for dynamic discrete manufacturing

21. Simulation based multiobjective schedule optimization in semiconductor manufacturing

22. Shop floor scheduling with simulation based proactive decision support

23. Optimization of a cycle time and utilization in semiconductor test manufacturing using simulation based, on-line, near-real-time scheduling system

24. Cycle time simulation study for cluster tool operation in IC fabrication

25. Impact of aggregating supplies from single supplier to a cluster of producers: opportunities for 3PL service providers

26. Methodologies for synchronised scheduling of assembly and air transportation in a consumer electronics supply chain

27. Optimal price and delivery time quotation with production scheduling for make-to-order manufacturing

Catalog

Books, media, physical & digital resources