1. Identification and assessment of risk factors affecting construction projects
- Author
-
Mohamed Sayed Bassiony Ahmed Abd El-Karim, Omar El Nawawy, and Ahmed Abdelalim
- Subjects
Construction management ,Engineering ,Cost estimate ,0211 other engineering and technologies ,Likelihood ,ComputingMilieux_LEGALASPECTSOFCOMPUTING ,02 engineering and technology ,lcsh:TH1-9745 ,Transport engineering ,Cost overrun ,Schedule overrun ,021105 building & construction ,0502 economics and business ,Risk assessment ,Probability ,business.industry ,05 social sciences ,Pre-construction services ,Cost contingency ,Scale ,Identification (information) ,Risk analysis (engineering) ,lcsh:TA1-2040 ,Cost engineering ,business ,lcsh:Engineering (General). Civil engineering (General) ,050203 business & management ,lcsh:Building construction - Abstract
Cost saving and time performance are usually essential to all parties who are involved in a construction project, that is owner, contractor, subcontractor. The main causes of disputes in construction projects involve delay and failure to complete the work in the specified cost and time frame. The delivery time of a project is a key factor to the owner in terms of cost as much as it is for the contractor.Unexpected increase in cost and delays in construction projects are caused by owner, contractor, environments, etc. in which several types of risk factors may occur concurrently. The effect of cost overrun and schedule overrun do not only influence the construction industry but the overall economy as well. Even though construction project increasing in cost and schedule has received extensive attention of researchers, but because of continuous changes and development in the field, the study considered of added value to the construction industry in Egypt, in addition to risk strategy and plan analysis. In order to meet the deadline of a project and due to the complex nature of construction projects, cost and scheduling should be flexible enough to accommodate changes without negatively affecting the overall project cost and duration. As such, the objectives of the presented research in this paper are to identify, study, and assess the effect of the factors that affect cost and time contingency. Data are collected from sixteen construction companies in Egypt. The collected data, output charts and analyses spreadsheets will be used for the development of computerized model built by the authors with identification abbreviation RIAM.
- Published
- 2017