1. Status report of the n_TOF facility after the 2nd CERN long shutdown period.
- Author
-
Patronis, N., Mengoni, A., Goula, S., Aberle, O., Alcayne, V., Altieri, S., Amaducci, S., Andrzejewski, J., Babiano-Suarez, V., Bacak, M., Balibrea Correa, J., Beltrami, C., Bennett, S., Bernardes, A. P., Berthoumieux, E., Beyer, R., Boromiza, M., Bosnar, D., Caamaño, M., and Calviño, F.
- Subjects
NUCLEAR astrophysics - Abstract
During the second long shutdown period of the CERN accelerator complex (LS2, 2019-2021), several upgrade activities took place at the n_TOF facility. The most important have been the replacement of the spallation target with a next generation nitrogen-cooled lead target. Additionally, a new experimental area, at a very short distance from the target assembly (the NEAR Station) was established. In this paper, the core commissioning actions of the new installations are described. The improvement in the n_TOF infrastructure was accompanied by several detector development projects. All these upgrade actions are discussed, focusing mostly on the future perspectives of the n_TOF facility. Furthermore, some indicative current and future measurements are briefly reported. [ABSTRACT FROM AUTHOR]
- Published
- 2023
- Full Text
- View/download PDF