54 results on '"L, Ahrens"'
Search Results
2. Calculation of mechanical and thermal stress in the RHIC beam dump windows
3. A simple crunching of the AGS 'bare' machine ORM data - February 2007 - to extract some aspects of AGS transverse coupling at injection and extraction
4. Notes on dumping gold beam in the AGS
5. Effects of Booster Scraping in Polarized Proton Runs 2006 and 2008
6. RHIC Polarized Proton Performance in Run-8
7. Beam Transport of 4 GeV Protons from AGS to the Proton Interrogation Target of the Neutrino line (Z_line) and Effect of the Air on the Transported Beam
8. Booster-to-AGS Multiwires and an Evolution of the Application Profile Display
9. AGS BPM Tests
10. Study of Orbits Produced by Individual Booster Extraction Bump Windings for the NASA Space Radiation Laboratory
11. Beam Studies on the AGS Polarized Proton 2006 Extraction Porch Part 1
12. Overcoming depolarizing resonances in the AGS with two helical partial siberian snakes
13. A Test of the Refurbished Jump Targets in the AGS
14. Design Concept for AGS Injection Kicker Upgrade to 2 GeV
15. Real and Modeled Effect of Booster Extraction Equipment on Dispersion
16. AGS Main Magnets Moved and BPM Survey Summer 2003
17. A method to measure the focusing properties (R. Matrix) of a magnet
18. Spin Dependence in Polarized pC → pC Scattering at Low Momentum Transfer and Polarimetry at RHIC
19. Analysis from Beam Studies with BTA Stripping Foils
20. Determining the Momentum of a Beam Accelerating in the AGS A Gauss Clock Calibration, and Associated Parameter Determination
21. Calculation of the Mean Energy Loss in the BTA Stripping Foils and Comparison with Measurement
22. Alternative Beam Optics for U-Line for lossless Beam Transport to the neutrino-line
23. Experimental Study of Beam Parameters Extracted from a Flag in the U Line an attempt to quantify errors
24. A Computer code to measure the Beam Emittance and Beam Parameters of the ATR Line
25. Proposal for Commissioning the RHIC BLM Threshold System
26. Five Quenches during the 2000 RHIC Gold Run
27. The RHIC Beam Dump Commissioning - Status Report
28. Eddy Current Effect of the BNL-AGS Vacuum Chamber on the Optics of the BNL-AGS Synchrotron
29. AGS Main Magnet Field Measurement using Polarized Protons
30. FEB/V(p):The FY1996 Commissioning with Proton Beam and Run for the V-Line and V-Target Commissioning
31. AGS PUE Geometry Factor and Normalization
32. Gold Beam Survival on a Magnetic Porch at Booster Injection
33. BtA Losses 25 June 96 at 8PM
34. AGS to RHIC Transfer Line: Design and Commissioning
35. AGS Extraction Radius Revisited -- Au77+
36. Measurement of the Sextupole String Center on the AGS Injection Porch
37. Extraction and Transport of Protons to Emulate 1 GeV/c/nucleon Iron Ions
38. Beam Losses Associated with the Booster-to-AGS Transfer and AGS Accumulation (1995)
39. Continued Search for the Source of the North Conjunction Area Muon Radiation--Shielding the H20 Electrostatic Septum
40. A [gamma][sub t]-jump scheme for the Brookhaven AGS
41. Calibration of the Stripped Electron Collector--Status Report
42. Vertical Chromaticity Study at 4.5 GeV/c in the AGS
43. Gamma-Transition, Yet Again
44. Orbit Changes from Moving Magnets E17 and K15
45. EXPERIMENTAL AND THEORETICAL STUDY OF THE AGS INJECTION AND CAPTURE
46. AGS horizontal and vertical emittance vs energy
47. Linac momentum spread--a crude measurement
48. Measurements of Chromaticity and Momentum Spread at Injection in the AGS Using PIP
49. Gamma-Transition Studies
50. Longitudinal Impedance Measurement at 3 BeV/c
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.