12 results on '"Howe, K."'
Search Results
2. INTERPRETATION OF PULSED-SOURCE EXPERIMENTS IN THE PEACH BOTTOM HTGR.
3. USE OF PULSED-SOURCE TECHNIQUE FOR REACTIVITY MEASUREMENTS OF THE PEACH BOTTOM HTGR.
4. PHYSICS TESTS DURING THE INITIAL OPERATION OF THE PEACH BOTTOM HTGR.
5. CONTROL ROD CALIBRATIONS DURING INITIAL RISE TO POWER IN PEACH BOTTOM. (Results of Post Construction R and D Procedure DP-9).
6. XENON POISONING DURING RISE TO POWER IN PEACH BOTTOM. Results of Post Construction R and D Test Procedures DP-8, GP-1, and GP-3.
7. PHYSICS PERFORMANCE OF THE PEACH BOTTOM HTGR.
8. TEMPERATURE AND POWER COEFFICIENT MEASUREMENT DURING RISE TO POWER IN PEACH BOTTOM (RESULTS OF POST CONSTRUCTION R AND D PROCEDURES DP-2, DP-3, DP-4, GP-2, AND GP-9).
9. ISOTHERMAL TEMPERATURE COEFFICIENT MEASUREMENT IN PEACH BOTTOM: RESULTS OF POST CONSTRUCTION R AND D TEST PROCEDURE CP-1.
10. PULSED SOURCE MEASUREMENTS OF CONTROL ROD WORTH IN PEACH BOTTOM: RESULTS OF POST CONSTRUCTION R AND D TEST PROCEDURES BP-4, 6, 9, 13.
11. PEACH BOTTOM, DIFFERENTIAL ROD WORTH MEASUREMENTS AND LOADING TO 804 ELEMENTS: RESULTS OF POST CONSTRUCTION R AND D TEST PROCEDURE BP-11.
12. LIFETIME CHARACTERISTICS OF A PEACH BOTTOM SIZE HTGR-DEPENDENCE UPON THE DIMENSIONALITY OF THE CALCULATION AND UPON THE NUMBER OF NEUTRON ENERGY GROUPS
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.