1. Treatment and Data Recovery Plan for the SRP Palo Verde to Pinal West 500 kV Transmission Line, Maricopa and Pinal Counties, Arizona
- Author
-
T. Kathleen Henderson
- Subjects
Historic ,Enterprise Canal ,Rock Alignment ,AZ T:9:5 (ASM) ,Domestic Structure or Architectural Complex ,Artifact Scatter ,AZ T:10:84 (ASM) ,AZ T:15:32 (ASM) ,AZ T:13:21 (ASM) ,AZ FF:9:17 (ASM) ,Agricultural or Herding ,Ancient Structure ,Archaeological Feature ,AZ T:13:134 (ASM) ,Patayan ,AZ T:15:36 (ASM) ,Metal ,Arizona ,AZ T:15:7 (ASM) ,AZ Z:2:66 (ASM) ,Canal or Canal Feature ,Gila Bend ,Hohokam ,Ground Stone ,AZ T:13:18 (ASM) ,Rock Art ,Gila River ,Mound / Earthwork ,Petroglyph ,Pit House / Earth Lodge ,Fire Cracked Rock ,Pinal (County) ,AZ Z:2:40 (ASM) ,Mobile ,AZ T:13:125 (ASM) ,Domestic Structures ,Phoenix ,AZ T:13:121 (ASM) ,Shade Structure / Ramada ,AZ T:15:9 (ASM) ,Shell ,Maricopa (County) ,Old State Route 80 ,AZ T:15:47 (ASM) ,Resource Extraction / Production / Transportation Structure or Features ,Chipped Stone ,Non-Domestic Structures ,Structure ,Water Control Feature ,Ceramic ,Research Design / Data Recovery Plan ,Gillespie Dam Site ,Gila Bend Canal ,AZ T:15:46 (ASM) ,Glass ,Human Remains ,Butterfield Stage Route ,Buckeye Hills ,State Route 238 - Abstract
Salt River Project Agricultural Improvement and Power District (SRP) plans to construct a new 500 kV transmission line between the existing Hassayampa Switchyard, west of Phoenix, Maricopa County, Arizona, and the proposed Pinal West Substation, western Pinal County, Arizona (Figure 1). Designated the Palo Verde to Pinal West (PV-PW) transmission line, this powerline is the first of two that SRP plans to eventually construct between the Hassayampa Switchyard and Pinal West Substation. Cultural resources surveys (Chapin- Pyritz and Hill 2002; Clark and Henderson 2007; Hill et al. 2003) for the current PV-PW transmission line identified 15 cultural properties within the project corridor that the Bureau of Land Management (BLM), in consultation with the Arizona State Historic Preservation Office (SHPO), has determined to be eligible for listing on the National Register of Historic Places. There is also a sixteenth property whose eligibility cannot be determined on the basis of present evidence. BLM has further concurred with SRP recommendations that construction of the PV-PW transmission line could affect cultural resources at six of these properties.
- Published
- 2007
- Full Text
- View/download PDF