1. Controlling subsidence caused by de-watering in a deep foundation pit.
- Author
-
Wang, Jianxiu, Feng, Bo, Liu, Yan, Wu, Lingao, Zhu, Yanfei, Zhang, Xingsheng, Tang, Yiqun, and Yang, Ping
- Subjects
- *
LAND subsidence , *UNDERGROUND construction , *BUILDING foundations , *SEEPAGE , *HOLES , *PREVENTION - Abstract
In China, more and more underground structures are being built close to buildings of architectural merit. When installing deep foundations, three ways of controlling seepage are suggested. In Mode III, an installed curtain extends partly into the confined aquifer so that the hydraulic connection between the excavated section and the water in the host material is partly isolated. The combined effects of pumping, curtain efficiency and recharge are discussed. Based on the engineering geological conditions of the deep foundation pit of the Yishan Road Station of Metro Line 9, Shanghai, China, in situ pumping and recharge tests were carried out. The combined effects are similar to the results obtained using a three-dimensional finite difference method (FDM) numerical simulation. [ABSTRACT FROM AUTHOR]
- Published
- 2012
- Full Text
- View/download PDF