230 results on '"Feng, Jingchun"'
Search Results
52. Reducing Construction Dust Pollution by Planning Construction Site Layout
53. Deep-Sea Sediment and Water Simulator for Investigation of Methane Seeping and Hydrate Formation
54. Formation Kinetics Studies of CH4 Hydrate in Brine and Porous Sediments by Micro-Differential Scanning Calorimeter
55. Peculiarity of CO2/H2 Hydrate Decomposition: The Equilibrium Decomposition Temperature Seems to be Affected by Different H2 Molecule Occupation
56. Role of deep-sea equipment in promoting the forefront of studies on life in extreme environments
57. Reliability model of organization management chain of South-to-North Water Diversion Project during construction period
58. Collaborative Evolution Mechanism of PMC Project Organizational Management System from the Perspective of Organizational Conflict
59. Study on cooperative strategies of rural water environment governance PPP project between companies and farmers from the perspective of evolutionary game
60. Development of an integrated prediction-optimization modeling approach for coupled risk management of water and energy nexus systems
61. Design of a real-time adaptive NURBS interpolator with axis acceleration limit
62. Feedrate scheduling strategy for free-form surface machining through an integrated geometric and mechanistic model
63. Variable-period feed interpolation algorithm for high-speed five-axis machining
64. Transformation of Cigarette Products Warehousing Electric Control System of Automatic Logistics Based on Recycling Smoke Box with Online Bar Code
65. Risk Evaluation of EPC Supply Chain Based on SCOR and Multi-Level Grey Model
66. Risk Evaluation of EPC Supply Chain Based on SCOR and Multi-Level Grey Model
67. Optimization Model of Schedule-Non-Commercial Resources Provided by Employers of Large Project Programs
68. Research on the quality risk assessment model for water conservancy projects based on the semi-supervised classification of text
69. Investigating the Interaction Effects between Reservoir Deformation and Hydrate Dissociation in Hydrate-Bearing Sediment by Depressurization Method
70. Optimization Model of Schedule-Non-Commercial Resources Provided by Employers of Large Project Programs.
71. The Research of Dual NURBS Curves Interpolation Algorithm for High-Speed Five-Axis Machining
72. Evaluation of the Quality Supervision System for Construction Projects in China Considering the Quality Behavior Risk Transmission
73. A Framework on Quality Risk Early Warning for Hydraulic Engineering Construction Based on LSTM
74. Study on Dynamic Prediction Model of Small Reservoir Safety Risk
75. Development of Deep-Sea Biological Resources Exploitation Equipment
76. Environmental and Ecological Protection Equipment in Deep Sea
77. Spatial-temporal Analysis for PPP Waste-to-energy Projects in China
78. Penalty Model of Work Schedule Delay of Program under Contracted Environment Based on Sub-Network.
79. Two Stage Optimization Models of the NCSRPE of Programs from the Perspective of Work.
80. Research on Credit Evaluation of Construction Market EntitiesBased on Conditional Random Field
81. Environmental and Ecological Protection Equipment in Deep Sea
82. Forecasting Volatility Returns of Oil Price Using Gene Expression Programming Approach
83. Achieving China’s Long-Term Carbon Emission Abatement Targets: A Perspective from Regional Disparity
84. Monodisperse spherical sandwiched core-shell structured SiO2Au Ta2O5 and SiO2Au Ta3N5 composites as visible-light plasmonic photocatalysts
85. Research on the Investment Costs of IT Project
86. Studies on combined model based on functional objectives of large scale complex engineering
87. Multichannel Luminescence Properties of Mixed-Valent Eu2+/Eu3+ Coactivated SrAl3BO7 Nanocrystalline Phosphors for Near-UV LEDs
88. PPP mode’s applications motivation in the field of water conservancy project - based on the “money service” theory of Milton Friedman
89. Allocation of control rights in the PPP Project: a cooperative game model
90. Water use efficiency of the Lancang-Mekong River basin region in “the Belt and Road Initiative”
91. An optimal allocation model of residual control rights in the hydraulic PPP project
92. Monodisperse spherical sandwiched core-shell structured SiO2[sbnd]Au[sbnd]Ta2O5 and SiO2[sbnd]Au[sbnd]Ta3N5 composites as visible-light plasmonic photocatalysts.
93. Risk Evaluation of EPC Supply Chain Based on SCOR and Multi-Level Grey Model: A Case Study of China's Waste Incineration Plant Project.
94. Multichannel Luminescence Properties of Mixed-Valent Eu2+/Eu3+ Coactivated SrAl3BO7 Nanocrystalline Phosphors for Near-UV LEDs.
95. Study on the restraint factors in selecting methods of IT project valuation
96. Research on the constitution and identification of IT project economic benefits
97. Study on the formation and identification of economic costs of IT project
98. Research on the social impact of IT project
99. Notice of Retraction: Research on the Theory Framework of Project Construction Management Process Reengineering
100. Notice of Retraction: Research on the formation and movement characteristics of IT project price
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.