1. A Cultural Resources Survey of the Proposed Hassayampa-Jojoba Transmission Line, Maricopa County, Arizona
- Author
-
Chapin-Pyritz, Regina L. and Hill, Matthew
- Subjects
Historic ,Abandoned Road Segment ,Enterprise Canal ,Ceramics ,Hunting Blind ,Chert flake ,AZ T:9:5 (ASM) ,Unlined irrigation canal alignment ,Artifact Scatter ,Archaeological Overview ,AZ T:10:84 (ASM) ,Red Rhyolite ,Lithics ,AZ FF:9:17 (ASM) ,Agricultural or Herding ,Trash Midden ,AZ T:9:63 (ASM) ,NA 12,771 ,buffware ,AZ T:9:60 (ASM) ,Wintersburg, AZ ,Lithic Scatter ,Archaeological Feature ,Cultural Resource Survey ,Trash Dump Site ,Formative Period ,Patayan ,AZ T:13:3 (ACS) ,Redware ,AZ Z:2:66 (ASM) ,AZ T:9:66 (ASM) ,Canal or Canal Feature ,Reconnaissance / Survey ,Rock Pile ,Road ,Patayan I To III ,AZ AA:2:120 (ASM) ,AZ T:13:2 (MNA) ,AAP74-002 ,AZ T:13:18 (ASM) ,Rock Art ,Railroad ,Gila River ,Plainware ,Petroglyph ,mudstone flake ,Road, Trail, and Related Structures or Features ,Gila Plainware, Salt Variety ,Fire Cracked Rock ,500 kV Transmission Line ,AD 1550s ,AZ Z:2:40 (ASM) ,AZ T:13:125 (ASM) ,Ceramic Scatter ,AZ T:13:121 (ASM) ,NA 15,683 ,Palomas Buff ,Southern Pacific Railroad ,Colorado Beige ,Lower Colorado Buffware ,Irrigation Canal ,Maricopa (County) ,Midden ,AZ T:13:19 (ASM) ,Basalt Flake ,Early Historic Period ,Phoenix, AZ ,Chipped Stone ,Transmission Line ,Prehistoric ,NA 15678 ,Late 1800s - Early 1900s ,Systematic Survey ,Ceramic ,Thermal Feature ,Quartzite ,Gillespie Dam Site ,Gila Bend Canal ,Old U.S. Highway 80 ,Bedrock Metate ,Patayan Ceramics ,AZ T:10:78 (ASM) - Abstract
GBPP (Gila Bend Power Partners) proposes to construct and operate a 500kV transmission line, which will deliver electrical power from the Hassayampa Switchyard south of Wintersburg, Arizona to the Jojoba Switchyard currently under construction in south-central Maricopa County, Arizona. The project will increase the transmission of electrical power into areas surrounding metropolitan Phoenix, and will promote economic development of benefit to the people of Arizona. GBPP retained EPG (Environmental Planning Group) to assist with the following: (1) preparation of an Environmental Assessment in support of a BLM (Bureau of Land Management) right-of-way grant, (2) an application to the Power Plant and Transmission Line Siting Committee of the Arizona Corporation Commission for a Certificate of Environmental Compatibility, (3) an application for an ASLD (Arizona State Land Department) right-of-way grant, and (4) an application for an USACE (U.S. Army Corp of Engineers) Section 404 permit. This report documents the results of the class I (records review) and class III (field inventory) cultural resource surveys conducted in support of the proposed transmission line project.
- Published
- 2002
- Full Text
- View/download PDF