120 results on '"Appa Iyer Sivakumar"'
Search Results
2. A simulation based analysis on reducing patient waiting time for consultation in an outpatient eye clinic.
3. Experimental study on variations of WIPLOAD Control in semiconductor wafer fabrication environment.
4. Online control of a batch processor with incompatible job families under correlated future arrivals.
5. Simulation analysis of cluster tool operations in wafer fabrication.
6. Online multiobjective single machine dynamic scheduling with sequence-dependent setups using simulation-based genetic algorithm with desirability function.
7. Simulation experimental investigation on job release control in semiconductor wafer fabrication.
8. Pareto control in multi-objective dynamic scheduling of a stepper machine in semiconductor wafer fabrication.
9. A bee colony optimization algorithm to job shop scheduling.
10. Using simulation based approach to improve on the mean cycle time performance of dispatching rules.
11. Bi-objective schedule control of batch processes in semiconductor manufacturing.
12. Look ahead batching to minimize earliness/tardiness measures in batch processes.
13. An inventory-routing problem with the objective of travel time minimization.
14. Application of queueing theory in health care: A literature review
15. Dynamic scheduling I: simulation-based scheduling for dynamic discrete manufacturing.
16. Factory scheduling: simulation based scheduling using a two-pass approach.
17. Semiconductor manufacturing: design, development and application of an object oriented simulation toolkit for real-time semiconductor manufacturing scheduling.
18. Modeling methodology: simulation based cause and effect analysis of cycle time and WIP in semiconductor wafer fabrication.
19. Scheduling & control: shop floor scheduling with simulation based proactive decision support.
20. Semiconductor manufacturing: simulation based multiobjective schedule optimization in semiconductor manufacturing.
21. Development of an Object Oriented Simulation Engine for On-Line Simulation and Optimization.
22. Simulation based cause and effect analysis of cycle time distribution in semiconductor backend.
23. Cycle time simulation study for cluster tool operation in IC fabrication.
24. Controlling job arrivals with processing time windows into Batch Processor Buffer.
25. Optimization of a cycle time and utilization in semiconductor test manufacturing using simulation based, on-line, near-real-time scheduling system.
26. Criteria selection and analysis for single machine dynamic on-line scheduling with multiple objectives and sequence-dependent setups.
27. Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain.
28. Scheduling of single stage assembly with air transportation in a consumer electronic supply chain.
29. Hierarchical minimization of completion time variance and makespan in jobshops.
30. A simulation based analysis of cycle time distribution, and throughput in semiconductor backend manufacturing.
31. An inventory–routing problem with the objective of travel time minimization
32. Scheduling and optimal delivery time quotation for customers with time sensitive demand
33. Controlling job arrivals with processing time windows into Batch Processor Buffer
34. Control of a Single Batch Processor With Incompatible Job Families and Future Job Arrivals
35. Bi-criteria Convoy Movement Problem
36. An efficient new job release control methodology
37. Analysis and algorithms for coordinated scheduling of parallel machine manufacturing and 3PL transportation
38. Impact of Production Control and System Factors in Semiconductor Wafer Fabrication
39. Cycle time variance minimization in dynamic scheduling of single machine systems
40. Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain
41. Controlling delivery performance in semiconductor manufacturing using Look Ahead Batching
42. Scheduling rules to achieve lead-time targets in outpatient appointment systems
43. Scheduling in static jobshops for minimizing mean flowtime subject to minimum total deviation of job completion times
44. Optimization of due-date objectives in scheduling semiconductor batch manufacturing
45. Minimizing total weighted tardiness on heterogeneous batch processing machines with incompatible job families
46. Online Multiobjective Pareto Optimal Dynamic Scheduling of Semiconductor Back-End Using Conjunctive Simulated Scheduling
47. Multi-objective scheduling of two-job families on a single machine
48. Synchronized scheduling of assembly and multi-destination air-transportation in a consumer electronics supply chain
49. Job shop scheduling techniques in semiconductor manufacturing
50. Single machine scheduling with multiple objectives in semiconductor manufacturing
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.