Search

Your search keyword '"Chuntian Cheng"' showing total 242 results

Search Constraints

Start Over You searched for: Author "Chuntian Cheng" Remove constraint Author: "Chuntian Cheng"
242 results on '"Chuntian Cheng"'

Search Results

1. China Southern Power Grid’s decarbonization likely to impact cropland and transboundary rivers

2. Market bidding method for the inter-provincial delivery of cascaded hydroelectric plants in day-ahead markets considering settlement rules

3. An efficient and accurate Mixed‐integer linear programming model for long‐term operations of large‐scale hydropower systems

4. A Data-Driven Bilevel Model for Estimating Operational Information of a Neighboring Rival’s Reservoir in a Competitive Context

5. Peak Shaving Model for Coordinated Hydro-Wind-Solar System Serving Local and Multiple Receiving Power Grids via HVDC Transmission Lines

6. Risk Analysis Method of Cascade Plants Operation in Medium Term Based on Multi-Scale Market and Settlement Rules

7. Multi-Objective Optimal Long-Term Operation of Cascade Hydropower for Multi-Market Portfolio and Energy Stored at End of Year

8. Optimization Model for the Short-Term Operation of Hydropower Plants Transmitting Power to Multiple Power Grids via HVDC Transmission Lines

9. Multi-Level Dependent-Chance Model for Hydropower Reservoir Operations

10. A Simplified Solution Method for End-of-Term Storage Energy Maximization Model of Cascaded Reservoirs

11. A modular parallelization framework for power flow transfer analysis of large-scale power systems

12. Robust short-term scheduling based on information-gap decision theory for cascade reservoirs considering bilateral contract fulfillment and day-ahead market bidding in source systems

13. A long-term intelligent operation and management model of cascade hydropower stations based on chance constrained programming under multi-market coupling

14. Combined Aggregated Sampling Stochastic Dynamic Programming and Simulation-Optimization to Derive Operation Rules for Large-Scale Hydropower System

15. Optimization Model for the Long-Term Operation of an Interprovincial Hydropower Plant Incorporating Peak Shaving Demands

16. Short-Term Scheduling of Expected Output-Sensitive Cascaded Hydro Systems Considering the Provision of Reserve Services

17. Climate Change Impacts on Hydropower in Yunnan, China

18. Peak Operation of Cascaded Hydropower Plants Serving Multiple Provinces

19. Modeling and Solution Techniques Used for Hydro Generation Scheduling

20. Long-Term Generation Scheduling for Cascade Hydropower Plants Considering Price Correlation between Multiple Markets

21. Mixed Integer Linear Programming Model for Peak Operation of Gas-Fired Generating Units with Disjoint-Prohibited Operating Zones

22. Simulation and Regulation of Market Operation in Hydro-Dominated Environment: The Yunnan Case

23. Mid-Term Electricity Market Clearing Price Forecasting with Sparse Data: A Case in Newly-Reformed Yunnan Electricity Market

24. Market Equilibrium and Impact of Market Mechanism Parameters on the Electricity Price in Yunnan’s Electricity Market

26. An Optimal Operation Method for Parallel Hydropower Systems Combining Reservoir Level Control and Power Distribution

28. SSDP Model with Inflow Clustering for Hydropower System Operation

32. Cross-regional integrated transmission of wind power and pumped-storage hydropower considering the peak shaving demands of multiple power grids

33. Impacts of different wind and solar power penetrations on cascade hydroplants operation

46. Daily peak shaving operation of cascade hydropower stations with sensitive hydraulic connections considering water delay time

47. A MILP Based Framework for the Hydro Unit Commitment Considering Irregular Forbidden Zone Related Constraints

48. An efficient and accurate Mixed‐integer linear programming model for long‐term operations of large‐scale hydropower systems

Catalog

Books, media, physical & digital resources