Search

Your search keyword '"Daniel Alejandro Rossit"' showing total 65 results

Search Constraints

Start Over You searched for: Author "Daniel Alejandro Rossit" Remove constraint Author: "Daniel Alejandro Rossit"
65 results on '"Daniel Alejandro Rossit"'

Search Results

1. An ERP implementation on a beekeeping and honey value chain

2. A Multi Objective Evolutionary Algorithm based on Decomposition for a Flow Shop Scheduling Problem in the Context of Industry 4.0

4. Post-industrial energy audit decision-making process: an Argentine case study

6. Lot streaming Permutation Flow shop with energy awareness

7. Scheduling in cloud manufacturing systems: Recent systematic literature review

8. Critical paths of non-permutation and permutation flow shop scheduling problems

15. Order picking and loading-dock arrival punctuality performance indicators for supply chain management: A case study

16. Mass customized/personalized manufacturing in Industry 4.0 and blockchain: Research challenges, main problems, and the design of an information architecture

19. One-of-a-kind Production in Cyber-Physical Production Systems Considering Machine Failures

21. Post-industrial energy audit decision-making process: an Argentine case study

22. A combinatorial analysis of the permutation and non-permutation flow shop scheduling problems

24. Scheduling in cloud manufacturing systems: Recent systematic literature review

25. Critical paths of non-permutation and permutation flow shop scheduling problems

28. A Big Data approach to forestry harvesting productivity

29. Lot Streaming Flow Shop with a Heterogeneous Machine

30. Designing a Scheduling Logic Controller for Industry 4.0 Environments

31. Evolution and Trends of Sustainable Approaches : Latest Development and Innovations in Science and Technology Applications

32. Modelling the Dynamics of a Digital Twin

33. Solving a flow shop scheduling problem with missing operations in an Industry 4.0 production environment

35. Simultaneous Lot-Sizing and Scheduling with Recovery Options: Problem Formulation and Analysis of the Single-Product Case

36. List of contributors

37. Minimizing Total Implementation Cost of a 2-D Indoor Localization System with a Constant Accuracy for Underground Mine Tunnels

38. Modelling the Dynamics of a Smart Factory

39. The tolerance scheduling problem for maximum lateness in Industry 4.0 systems

41. Stochastic forestry harvest planning under soil compaction conditions

42. Towards the assessment of the efficiency and sustainability of energy-based Investment projects

43. Application of a methodology to design a municipal waste pre-collection network in real scenarios

44. The Tolerance Scheduling Problem in a Single Machine Case

45. An Industry 4.0 approach to assembly line resequencing

46. Industry 4.0: Smart Scheduling

47. The Argentinian forest sector: opportunities and challenges in supply chain management

48. Production Research : 10th International Conference of Production Research - Americas, ICPR-Americas 2020, Bahía Blanca, Argentina, December 9-11, 2020, Revised Selected Papers, Part I

49. Strategic planning in a forest supply chain: a multigoal and multiproduct approach

50. A memetic algorithm for the integral OBP/OPP problem in a logistics distribution center

Catalog

Books, media, physical & digital resources