Search

Your search keyword '"Marconato, N"' showing total 299 results

Search Constraints

Start Over You searched for: Author "Marconato, N" Remove constraint Author: "Marconato, N"
299 results on '"Marconato, N"'

Search Results

1. Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

4. Status of SPIDER beam source after the first 3.5 years of operation

5. Role of Electron Stimulated Desorption in the initiation of HVDC vacuum arc

6. RFX-mod2 diagnostic capability enhancements for the exploration of multi-magnetic-configurations

8. On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress

9. Optimizing the ITER NBI ion source by dedicated RF driver test stand

10. SPIDER in the roadmap of the ITER neutral beams

13. Development of X-Ray Collimators to Identify Sources of Radiation in Devices Insulated by Large Vacuum Gaps

14. The new vessel complex for the RFX-mod2 experiment: An effective synergy between fusion research and technological development

15. Highlights of recent SPIDER results and improvements

16. SPIDER, the Negative Ion Source Prototype for ITER: Overview of Operations and Cesium Injection

17. Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

18. Corrigendum to “Status of SPIDER beam source after the first 3.5 years of operation” [Fusion Engineering and Design, Volume 192, July 2023, 113831]

19. Highlights of recent SPIDER results and improvements

22. A substantial step forward in the realization of the ITER HNB system: The ITER NBI Test Facility

24. Lessons learned after three years of SPIDER operation and the first MITICA integrated tests

26. SPIDER, the Negative Ion Source Prototype for ITER: Overview of Operations and Cesium Injection

27. On the road to ITER NBIs: SPIDER improvement after first operation and MITICA construction progress

29. Improved Conceptual Design of the Beamline for the DTT Neutral Beam Injector

30. Strategy for Vacuum Insulation Tests of MITICA 1 MV Electrostatic Accelerator

32. Recent improvements to the ITER neutral beam system design

33. First operations with caesium of the negative ion source SPIDER

35. Procurement and installation of permanent magnets in SPIDER Grounded Grid and Extraction Grid PBS: 53.SI.A1

38. Preparation of the vacuum insulation tests on the MITICA 1 MV electrostatic Accelerator

40. A locked mode indicator for disruption prediction on JET and ASDEX upgrade

41. The magnetic diagnostic set for ITER

42. Design of embedded electrostatic sensors for the RFX-mod2 device

43. A locked mode indicator for disruption prediction on JET and ASDEX upgrade

44. Progress in the ITER neutral beam test facility

45. Overview of the JET preparation for deuterium-tritium operation with the ITER like-wall

46. First principles and integrated modelling achievements towards trustful fusion power predictions for JET and ITER

47. Improved Conceptual Design of the Beamline for the DTT Neutral Beam Injector

48. Status of the upgrade of RFX-mod2

49. Activities on the task PROJ_11 «Procurement and installation of permanent magnets in SPIDER Grounded Grid» PBS : 53.SI.A1

50. SPIDER, the negative ion source prototype for ITER: first operations with caesium

Catalog

Books, media, physical & digital resources