Search

Your search keyword '"Pérez-Díaz, Juan I."' showing total 43 results

Search Constraints

Start Over You searched for: Author "Pérez-Díaz, Juan I." Remove constraint Author: "Pérez-Díaz, Juan I."
43 results on '"Pérez-Díaz, Juan I."'

Search Results

2. Optimisation models for the day-ahead energy and reserve scheduling of a hybrid wind-battery virtual power plant

38. Wave farms grid code compliance in isolated small power systems.

39. Control Strategy and Sizing of a Flywheel Energy Storage Plant for the Frequency Control of an Isolated Wind-Hydro Power System.

40. Deriving Optimal End of Day Storage for Pumped-Storage Power Plants in the Joint Energy and Reserve Day-Ahead Scheduling.

42. Failures during Load-Frequency Control Maneuvers in an Upgraded Hydropower Plant: Causes, Identification of Causes and Solution Proposals.

43. Integration of fast acting energy storage systems in existing pumped‐storage power plants to enhance the system's frequency control.

Catalog

Books, media, physical & digital resources