1. Doyon Utilities Raptor Transmission Line Phase I Archaeological Survey Report, United States Air Force Joint Base Elmendorf-Richardson, Alaska
- Author
-
Blanchard, Morgan R. and Higgs, Andy
- Subjects
Final Report ,Doyon Utilities Raptor Transmission Line ,Ethnohistoric Research ,Building 986 ,Building 700 ,Building 10909 ,United States Air Force ,Anchorage, AK ,Ship Creek ,Building 4905 ,Building 35610 ,Building 10871 ,Cook Inlet ,ANC-01297 ,ANC-01171 ,Historic District ,ANC-02910 ,ANC-01228 ,Building 953 ,Building 5887 ,ANC-00014 ,Building 4913 ,Reconnaissance / Survey ,Building 35620 ,Homestead Era ,ANC-01063 ,ANC-01061 ,ANC-01062 ,Building 10907 ,Cultural Resources ,Building 724 ,Building 5893 ,ANC-01199 ,ANC-03059 ,ANC-01276 ,ANC-03939 ,Building 35750 ,ANC-03938 ,ANC-03937 ,Building 35752 ,ANC-03936 ,Building 12757 ,ANC-01076 ,ANC-01274 ,ANC-03057 ,ANC-01198 ,ANC03937 ,ANC-01270 ,Building 25620 ,ANC-01071 ,ANC-03945 ,Historic Background Research ,Building 736 ,ANC-03944 ,ANC-03943 ,Building 733 ,Methodology, Theory, or Synthesis ,ANC-03942 ,Phase I Archaeological Survey ,ANC-01201 ,ANC-03941 ,Building 732 ,ANC-01202 ,ANC-03940 ,Fort Richardson, AK ,Building 730 ,ANC-01200 ,ANC-01929 ,Building 36012 ,Alaska (State / Territory) ,Research Design / Data Recovery Plan ,ANC-03946 ,Joint Base Elmendorf-Richardson ,Building 7 ,Human Remains ,Building 25610 ,ANC-03063 - Abstract
Doyon Utilities, LLC implemented the construction of the Raptor Transmission Line (RTL) located on Joint Base Elmendorf-Richardson (JBER) at the direction of the 673d Civil Engineering Squadron to enhance the electrical distribution system found on the installation. Weston Solutions, Inc. (WS) has been contracted by Doyon Utilities to provide environmental permitting services for the project. WS contracted with Northern Land Use Research (NLUR) to conduct a Level I "reconnaissance" archaeological survey, as defined by the Alaska Office of History and Archaeology (OHA) (Historic Preservation Series No. 11, revised 2003), of the RTL right-of-way (ROW), primarily focused on sections of the proposed route found on the former Elmendorf Air Force Base located south of Grady Road. The findings within this report are not focused on the previously completed archeological surveys that were executed prior to the 2008 Utilities Privatization of Fort Richardson and ROW conveyances to Doyon Utilities outside of this effort. The findings within those areas are outside the scope of this report.
- Published
- 2012
- Full Text
- View/download PDF