87 results on '"Shimada, Taihei"'
Search Results
2. Commissioning of the next-generation LLRF control system for the Rapid Cycling Synchrotron of the Japan Proton Accelerator Research Complex
3. Development of a single-ended magnetic alloy loaded cavity in the Japan Proton Accelerator Research Complex rapid cycling synchrotron
4. Estimation of the Anode Power Supply Current of the J-PARC MR RF system for 1.36s cycle operation.
5. Achievement of very low jitter extraction of high power proton beams in the J-PARC RCS
6. Influence of a Positive Grid Biasing on RF System in J-PARC RCS
7. Status and Upgrade Plan of the MR Ring RF Systems in J-PARC
8. Design studies on a high-power wide-band RF combiner for consolidation of the driver amplifier of the J-PARC RCS
9. Design and actual performance of J-PARC 3 GeV rapid cycling synchrotron for high-intensity operation
10. Consideration of Triple-Harmonic Operation for the J-PARC RCS
11. Vacuum Tube Operation Tuning for a High Intensity Beam Acceleration in J-PARC RCS
12. Operation Experience of Tetrode Vacuum Tubes in J-PARC Ring RF System
13. Simulation of Phase-space Offset Injection with Second Harmonic RF for Longitudinal Emittance Blow-up in J-PARC MR
14. Inhibition of steam gasification of char by volatiles in a fluidized bed under continuous feeding of a brown coal
15. Accelerator design for 1.3-MW beam power operation of the J-PARC Main Ring
16. Kinetics of steam gasification of nascent char from rapid pyrolysis of a Victorian brown coal
17. Points of onset of gasification in a multi-walled carbon nanotube having an imperfect structure
18. Simulations of Beam Loading Compensation in a Wideband Accelerating Cavity Using a Circuit Simulator Including a LLRF Feedback Control
19. Vacuum Tube Operation Analysis for 1.2 MW Beam Acceleration in J-PARC RCS
20. Simulations of beam loading compensation in a wideband accelerating cavity using a circuit simulator including a LLRF feedback control
21. Multiharmonic vector rf voltage control for wideband cavities driven by vacuum tube amplifiers in a rapid cycling synchrotron
22. Present Status and Future Upgrades of the J-PARC Ring RF Systems
23. Conceptual Design of a Single-Ended MA Cavity for J-PARC RCS Upgrade
24. Baseband simulation model of the vector rf voltage control system for the J-PARC RCS
25. Batch Compression Scheme for Multi-MW J-PARC
26. An Upgrade Scenario of RF System to Achieve 1.6 MW Beam Acceleration in J-PARC RCS
27. Simulation of Beam Behavior Caused by Odd Harmonics of Beam Loading in J-PARC RCS
28. Observation of simultaneous oscillations of bunch shape and position caused by odd-harmonic beam loading in the Japan Proton Accelerator Research Complex Rapid Cycling Synchrotron
29. Development of High Gradient RF System for J-PARC Upgrade
30. Air-cooled Magnetic Alloy Cavity for J-PARC Doubled Rep.-rate Scenario
31. Status of the J-PARC Ring RF Systems
32. High intensity single bunch operation with heavy periodic transient beam loading in wide band rf cavities
33. Simulation of Phase Modulation for Longitudinal Emittance Blow-Up in J-PARC MR
34. High Temperature μSR Experiments for Accelerator Developments
35. Simulation of Longitudinal Emittance Control in J-PARC RCS
36. Dual-harmonic Phase Control in the J-PARC RCS
37. Development of a high gradient rf system using a nanocrystalline soft magnetic alloy
38. Multiharmonic rf feedforward system for compensation of beam loading and periodic transient effects in magnetic-alloy cavities of a proton synchrotron
39. Beam commissioning and operation of the J-PARC main ring synchrotron
40. Multiharmonic rf feedforward system for beam loading compensation in wide-band cavities of a rapid cycling synchrotron
41. Longitudinal painting with large amplitude second harmonic rf voltages in the rapid cycling synchrotron of the Japan Proton Accelerator Research Complex
42. Corrigendum to ‘Kinetics of steam gasification of nascent char from rapid pyrolysis of a Victorian brown coal’
43. Recovery of Nickel from Selectively Reduced Laterite Ore by Sulphuric Acid Leaching.
44. A Preliminary Experiment of Volatilization of Minerals in Coal Ash by Chlorination Treatment
45. Lowering of Grinding Energy and Enhancement of Agglomerate Strength by Dehydration of Indonesian Laterite Ore.
46. Adsorption Property of Submicron Particles with Carbonaceous Materials for Recycling EAF Dust.
47. Combustion Waste Gas Cleaning by Carbonized Refuse-Derived Fuel(RDF).
48. Feasibility of Rotary Cup Atomizer for Slag Granulation.
49. Reduction rate of cement bonded laterite briquette with CO-CO2 gas
50. Effects of Slag Compositions on the Rate of Methane-Steam Reaction.
Catalog
Books, media, physical & digital resources
Discovery Service for Jio Institute Digital Library
For full access to our library's resources, please sign in.