Search

Your search keyword '"WBS"' showing total 465 results

Search Constraints

Start Over You searched for: Descriptor "WBS" Remove constraint Descriptor: "WBS"
465 results on '"WBS"'

Search Results

1. Early treatment response assessment with [177Lu]PSMA whole-body-scintigraphy compared to interim PSMA-PET

2. Identification of Green Retrofitting Procurement and Permitting Processes in High-rise Office Buildings in Jakarta Based on PerMen PUPR No.21 Year 2021 and GBC Indonesia that Affects Project Time Performance.

3. Multi-Project Information Management Platform Based on PDIE System

4. Еffects of sectoral structure of foreign direct investment on economic development: the case of Еuropean developing countries

5. Development of a Risk Analysis Method using a Hybrid of WBS and PESTLE on a Construction Project.

6. Developing Parametric Modelling for Class 4 Estimate of Pier and Jetty Construction by Analyzing Historical Databases using AI Tools & EVM Techniques.

7. Building an Econometrics Model for Pier Construction in an Indonesian Oil and Gas Company.

8. EFFECTS OF SECTORAL STRUCTURE OF FOREIGN DIRECT INVESTMENT ON ECONOMIC DEVELOPMENT: THE CASE OF EUROPEAN DEVELOPING COUNTRIES.

9. Tumor Burden of Iodine-Avid Bone Metastatic Thyroid Cancer Identified via 18 F-Sodium Fluoride PET/CT Imaging.

10. Use of Capsid Integrity-qPCR for Detecting Viral Capsid Integrity in Wastewater.

12. Enhancing Project Management Efficiency in PERTAMINA through Work Breakdown Structure (WBS) and Cost Breakdown Structure (CBS) Integration.

13. Analisis good corporate governance, pengendalian internal, dan whistleblowing system dan fraud

14. Characterization of 2DEG on WG semiconductors through sub-sampled 4DSTEM

15. Use of Capsid Integrity-qPCR for Detecting Viral Capsid Integrity in Wastewater

16. Exploring the Economy -- Environment Interactions in the Western Balkans: A Panel Data Analysis.

17. OpenBIM Methods and Tools for Schedule and Cost Management

18. Safety Risk Identification Method for Railway Construction in Complex and Dangerous Areas.

20. PERT/CPM을 이용한 Activity에 대한 연결 공정관리가 가능한 프로젝트 관리 시스템의 설계 및 구현.

21. Development of Risk-Based Standardized WBS (Work Breakdown Structure) for Preparatory, Instrumentation and Control Works of Coal-Fired Steam Power Plant Construction Project in Indonesia to Improve Time Performance.

22. Development of Risk-Based Standardized WBS (Work Breakdown Structure) for Civil and Structural Works of Coal-Fired Steam Power Plant Construction Project in Indonesia to Improve Time Performance.

23. A Case Study on BIM Object-Based Earned Value and Process Management in Highway Construction.

24. Manajemen proyek Sistem Informasi Penggajian Berbasis Web

25. Security aware information classification in health care big data.

26. WBS-free scheduling method based on database relational model.

27. DEVELOPMENT OF AN EARLY LIFECYCLE CONCEPTUAL CONFIGURATION MANUFACTURABILITY ASSESSMENT METRIC FOR TRADESPACE ANALYTICS.

28. Best Tested and Proven Practices for Hospital Construction: Standardized Multidimensional WBS/CBS Coding Structures.

29. Atypical 7q11.23 deletions excluding ELN gene result in Williams–Beuren syndrome craniofacial features and neurocognitive profile.

30. Building Multidimensional Standardized Work Breakdown Structure, Cost Breakdown Structure, and Cost Estimation of The Battery Laboratory Project .

31. Multi-dimensional Project Breakdown Structures to Ensure Efficient Delivery of Hospital Construction.

32. Incremental diagnostic value of [18F]tetrafluoroborate PET-CT compared to [131I]iodine scintigraphy in recurrent differentiated thyroid cancer.

34. Chapter Identifying and Developing Prerequisites for Takt Planning in a BIM-Based Construction Process

35. PERENCANAAN MANAJEMEN PROYEK DALAM MENINGKATKAN EFISIENSI DAN EFEKTIFITAS SUMBER DAYA PERUSAHAAN (Studi Kasus : Qiscus Pte Ltd)

36. Use of Capsid Integrity-qPCR for Detecting Viral Capsid Integrity in Wastewater.

37. Development of Risk-Based Standardized WBS (Work Breakdown Structure) for Quality Planning of Road Construction Project.

38. The Development of Risk-Based Standardized WBS (Work Breakdown Structure) for Cost Estimation of Concrete Precast Bridge Construction.

39. 99mTc-MIBI全身显像及P糖蛋白预测中晚期 非小细胞肺癌患者多药的耐药性.

40. Detection of the clinically persistent, pathogenic yeast spp. Candida auris from hospital and municipal wastewater in Miami-Dade County, Florida.

43. MEMES AS A LINGUISTIC PHENOMENON USED IN MARKETING ON SOCIAL NETWORKS AND THEIR IMPACT ON TRENDS IN FINANCIAL MARKETS

46. Safety Risk Identification Method for Railway Construction in Complex and Dangerous Areas

47. Efficient Work Team Scheduling: Using Psychological Models of Knowledge Retention to Improve Code Writing Efficiency

48. Pathophysiology of TFII-I: Old Guard Wearing New Hats.

49. NATO gyakorlatokon alkalmazható logisztikai projektmenedzsment (GANTT, WBS, CPM- és szimuláció).

50. Escopo de projeto não definido: erro de gestão - Sobre a lição de 'Alice no País das Maravilhas'

Catalog

Books, media, physical & digital resources