Search

Your search keyword '"Wendt, Manfred"' showing total 86 results

Search Constraints

Start Over You searched for: Author "Wendt, Manfred" Remove constraint Author: "Wendt, Manfred"
86 results on '"Wendt, Manfred"'

Search Results

1. MuCol Milestone Report No. 5: Preliminary Parameters

2. The AWAKE Run 2 programme and beyond

3. RF Measurement Techniques

6. HOM Choice Study with Test Electronics for use as Beam Position Diagnostics in 3.9 GHz Accelerating Cavities in FLASH

7. Imaging Techniques for Relativistic Beams: Issues and Limitations

8. Development of the self-modulation instability of a relativistic proton bunch in plasma

10. A beam position monitor for electron bunch detection in the presence of a more intense proton bunch for the AWAKE experiment

11. The AWAKE Run 2 Programme and Beyond

12. The AWAKE Run 2 Programme and Beyond

13. Beam Instrumentation Challenges for FCC-ee

14. Recent AWAKE Diagnostics Development and Operational Results

16. Beam Position Detection of a Short Electron Bunch in Presence of a Longer and More Intense Proton Bunch for the AWAKE Experiment

17. Commissioning of ALPS, the New Beam Position Monitor System of CERN’s Super Proton Synchrotron

18. Signal Analysis and Detection for the BPMs of the LHC Hollow Electron Lens

20. MD1447 –β∗–Reach: 2016 IR7 Collimation Hierarchy Limit and Impedance

21. Direct Digitization and ADC Parameter Trade-off for Bunch-by-Bunch Signal Processing

22. Technology and First Beam Tests of the New CERN-SPS Beam Position System

23. Development of the electron beam probe for hadron synchrotrons

24. Status of the CLEAR electron beam user facility at CERN

25. MD 2408: Study of Schottky Monitors for Q' Measurement at Injection

26. Performance of the AWAKE Proton Beam Line Beam Position Measurement System at CERN

27. en-usDigital Signal Processing Techniques to Monitor Bunch-by-Bunch Beam Positions in the LHC for Machine Protection Purposes

28. Upgrade of the CERN SPS Beam Position Measurement System

29. Identification of Imperfections in Impedance Shields on the SPS-QF Flanges via Non-Intrusive Measurements

31. Project X

32. Main Achievements of the PACMAN Project for the Alignment at Micrometric Scale of Accelerator Components

33. Beam Instrumentation Developments for the Advanced Proton Driven Plasma Wakefield Acceleration Experiment at CERN

34. Improvements to the LHC Schottky Monitors

35. A Wire-Based Methodology to Analyse the Nanometric Resolution of an RF Cavity BPM

36. The 2016 Proton-Nucleus Run of the LHC

37. A Broadband Transverse Kicker Prototype for Intra-Bunch Feedback in the CERN SPS

38. Study of the Electrical Center of a Resonant Cavity Beam Position Monitor (RF-BPM) and Its Integration with the Main Beam Quadrupole for Alignment Purposes

39. Fiducialisation and initial alignment of CLIC component with micrometric accuracy

40. Commissioning of beam instrumentation at the CERN AWAKE facility after integration of the electron beam line

41. MD 400: LHC emittance growth in presence of an external source of noise during collision

42. Status of the PACMAN Project

43. PACMAN Project: A New Solution for the High-accuracy Alignment of Accelerator Components

44. Beam Tests of a Prototype Stripline Beam Position Monitoring System for the Drive Beam of the CLIC Two-beam Module at CTF3

45. Stretched-Wire Techniques and Measurements for the Alignment of a 15GHz RF-BPM for CLIC

46. Electromagnetic Field Pre-alignment of the Compact Linear Collider (CLIC) Accelerating Structure with help of Wakefield Monitor Signals

47. Development and Test of High Resolution Cavity BPMs for the CLIC Main Beam Linac

48. Upgrade of the LHC Schottky Monitor, Operational Experience and First Results

49. Summary of LHC MD:377: Schottky pick-up

50. Electromagnetic Design and Optimization of Directivity of Stripline Beam Position Monitors for the High Luminosity Large Hadron Collider

Catalog

Books, media, physical & digital resources