Search

Your search keyword '"Wilkinson, P. B."' showing total 475 results

Search Constraints

Start Over You searched for: Author "Wilkinson, P. B." Remove constraint Author: "Wilkinson, P. B."
475 results on '"Wilkinson, P. B."'

Search Results

8. Optimized survey design for electrical resistivity tomography: combined optimization of measurement configuration and electrode placement

9. Jointly reconstructing ground motion and resistivity for ERT-based slope stability monitoring

10. Improved characterisation and modelling of measurement errors in electrical resistivity tomography (ERT) surveys

12. Geoelectrical monitoring of simulated subsurface leakage to support high-hazard nuclear decommissioning at the Sellafield Site, UK

13. Management of new-onset hypertension in pregnancy.

14. Renal Autotransplantation for Uncontrolled Hypertension in Nonatherosclerotic Renal Artery Stenosis—2 Case Reports and a Brief Review of the Literature.

17. Fluvial response to Late Pleistocene and Holocene environmental change in a Thames chalkland headwater: the Lambourn of southern England

18. Interpolation of landslide movements to improve the accuracy of 4D geoelectrical monitoring

21. Attachment Strength and Relationship Expectancies in the Prediction of Adolescent Stress and Depression

22. A Practical Guide to Strategic Enrollment Management Planning

23. Using dynamical barriers to control the transmission of light through slowly-varying photonic crystals

24. 2024 Recommendations for Validation of Noninvasive Arterial Pulse Wave Velocity Measurement Devices.

31. Repurposed immunomodulatory drugs for Covid-19 in pre-ICu patients - mulTi-Arm Therapeutic study in pre-ICu patients admitted with Covid-19 – Repurposed Drugs (TACTIC-R): A structured summary of a study protocol for a randomised controlled trial

33. Predicting Functional Gains in a Stroke Trial

34. An assessment of brain function predicts functional gains in a clinical stroke trial

36. Shouldering the load: musculoskeletal hazards in shoulder arthroplasty.

37. Validation of non-invasive central blood pressure devices: Artery society task force (abridged) consensus statement on protocol standardization

48. Proactive Infrastructure Monitoring And Evaluation (PRIME) installation in Canada: protecting national railways by monitoring moisture in an active landslide near Ashcroft, British Columbia

49. Abstracts from the NIHR INVOLVE Conference 2017: London, UK. 28 November 2017

Catalog

Books, media, physical & digital resources