Search

Your search keyword '"construction stage"' showing total 177 results

Search Constraints

Start Over You searched for: Descriptor "construction stage" Remove constraint Descriptor: "construction stage"
177 results on '"construction stage"'

Search Results

1. Statistical review of literature sources on carbon emissions during the CSPB based on knowledge graphs.

2. Dynamic control method of construction cost based on fuzzy neural network

3. Static analysis of semi‐underground double‐storey squat silo.

5. Investigation of the Mechanical Features of Steel–Concrete Composite Girder Rigid Frame Bridges with V-Shaped Piers during Construction Stages.

6. 中国境外经贸合作区的发展策略选择 ——以东南亚为例.

7. Investigation of Vibration Characteristics during Various Building Construction Stages under Train Operations.

8. 大直径跨海盾构隧道U型段管片纵向应力现场实测分析.

9. Understanding the Construction Stage Analysis of Kozlupınar Bridge

10. 基于实体结构分解的设计转施工模型研究.

11. Investigation of the Mechanical Features of Steel–Concrete Composite Girder Rigid Frame Bridges with V-Shaped Piers during Construction Stages

12. Investigation of Vibration Characteristics during Various Building Construction Stages under Train Operations

13. INFLUENCE OF CONSTRUCTION PERIOD OF BRIDGE ACROSS RESERVOIR ON OPERATION OF ADJACENT POWER STATION.

14. 基于无应力状态法的斜拉桥施工控制 仿真分析方法.

15. 双缆悬索桥空缆状态主缆抗滑安全性研究.

16. 基于最优化原理的大跨度劲性骨架拱桥外包混凝土 分环分段浇筑分析.

17. Construction Stage Seismic Resilience Evaluation of a Continuous Girder Bridge with the Cast-in-Place Cantilever Construction Method

18. Information Management Analysis of Prefabricated Building Based on BIM in Construction Stage

19. Do high-speed rail (HSR) station and airport affect local government debt risk? Evidence from China.

20. 建设工程项目施工阶段参与主体管理 行为三方演化博弈研究.

21. SHEAR LAG EFFECT STUDY OF A COMPOSITE GIRDER CABLE-STAYED BRIDGE DURING CONSTRUCTION.

22. 某装配式租赁住宅 BIM 技术应用.

23. 圆筒型FPSO 建造阶段腐蚀与防护工艺研究.

24. Seismic performance assessment of a base-isolated hospital building subjected to February 6, 2023, Kahramanmaraş, Türkiye earthquakes (Mw 7.7 Pazarcık and Mw 7.6 Elbistan) and seismic fragility analysis considering different construction stages

25. Application of BIM Technology in the Construction Phase of Prefabricated Buildings

27. Study on mechanical performance of prefabricated concrete sandwich arch roof during construction.

28. Unloading and Reloading Process for the Earthquake Damage Repair of Ancient Masonry Columns: The Case of the Basilica di Collemaggio.

29. Brücke Hohenpolding – Beeinflussung der Betonspannungen durch vorgegebene Bauzustände.

30. Assessing the Structural Behavior of a New UHPC-Infilled Top Chords Integrated Deck Plate System at Construction Stage.

31. 斜拉桥施工阶段主梁截面 温差效应计算研究.

32. Vilka klimatåtgärder används vid nybyggnad : En kvalitativ intervjustudie med företag inom bygg- och fastighetssektorn

34. 大跨径中承式钢箱系杆拱桥施工阶段稳定性分析.

35. Pollutants Concentration during the Construction and Operation Stages of a Long Tunnel: A Case Study of Lowari Tunnel, (Dir–Chitral), Khyber Pakhtunkhwa, Pakistan.

36. Construction Waste Minimization: A Narrative Review.

37. 建设工程项目施工阶段冲突影响因素--基于ISM+MICMAC 分析.

38. Comparación de la respuesta estructural de un puente viga cajón de voladizos sucesivos durante construcción y en servicio en tres escenarios de humedad relativa de Colombia.

39. Slope failures during the construction stage at Musandam independent power plant, Oman.

40. A Behavioral Framework for Construction Waste Minimization: The Case of Jordan.

41. 高寒地区组合梁斜拉桥施工阶段温度效应研究.

42. A simplified approach to assess dynamic amplification due to accidental release of formwork traveller during the construction stages of bridges.

43. Pollutants Concentration during the Construction and Operation Stages of a Long Tunnel: A Case Study of Lowari Tunnel, (Dir–Chitral), Khyber Pakhtunkhwa, Pakistan

44. Risk Assessment of Tunnel Portals in the Construction Stage Based on Fuzzy Analytic Hierarchy Process

46. 单箱多室宽幅箱梁桥施工剪力滞效应.

47. Study on the safety of the concrete pouring process for the main truss arch structure in a long-span concrete-filled steel tube arch bridge.

48. A rockburst intensity criterion based on the Geological Strength Index, experiences learned from a deep tunnel.

49. Modelling waste generated during construction of buildings using regression analysis.

50. Experiment on the Behavior of a Self-Anchored Suspension and Cable-Stayed Hybrid Bridge during Structural Transformation.

Catalog

Books, media, physical & digital resources