1. Analysis of investment potential and feasibility in solar power plant development planning in West Java.
- Author
-
Salebbay, Jalius, Syaiful, and Mahroji, Dwi
- Subjects
- *
SOLAR power plants , *RENEWABLE energy sources , *INVESTMENT analysis , *PAYBACK periods , *PLANT development - Abstract
PLTB The purpose of this study was to assist Indonesia's efforts to use renewable energy sources. This study aims to evaluate the viability and possibility of funding the construction of solar power plants in Cimanuk Cisanggarung, Cidanau-Ciujung-Cidurian, and Seputih-Skampung. Surveys and documentation were the study's techniques. Three locations along the river were used to collect survey data. On the other hand, the documentation data originated from the development blueprint of the PT Perum Jasa Tirta II area. Next, Homer software processes the solar power plant simulation data. With 167,067 kWh produced in Cimanuk-Cisanggarung, 64,257 kWh in Cidanau-Ciujung-Cidurian, and 224,898 kWh in Seputih - Sekampung, the capacity is the highest in the Seputih - Sekampung region. Cimanuk-Cisanggarung energy sales are estimated to be Rp. 173,044,554 annually, Cidanau-Ciujung-Cidurian at Rp. 66,555,598 annually, and Seputih-Sekampung at Rp. 232,944,591 annually. The development plan involves an investment of Rp 2,222,937,099 in the Cimanuk-Cisanggarung area, Rp 2,351,427,150 in Cidanau-Ciujung-Cidurian, and Rp 5,063,535,714 in Seputih – Sekampung. The payback periods for each project are 13, 35, and 22 years. The BCR values are 1.24, 1.20, and 1.02, and the NPV values are 0.89, 0.99, and 1.01 or > 0, with an IRR of 0. It indicates that only the Cimanuk-Cisanggarung region satisfies the criteria among these three regions. The investment requirements in terms of time. CO2 reduction from the Cimanuk-Cisanggarung area by 13.7 tons of CO2, Cidanau-Ciujung-Cidurian 5.3 CO2, and Seputih - Sekampung 18.4 CO2. [ABSTRACT FROM AUTHOR]
- Published
- 2024
- Full Text
- View/download PDF