Back to Search
Start Over
Evaluation of the Project Timeliness with Fuzzy Constraints.
- Source :
-
AIP Conference Proceedings . 2015, Vol. 1648 Issue 1, p1-4. 4p. - Publication Year :
- 2015
-
Abstract
- This paper concerns to the RCPS problem with imprecise activity duration times and flexible constraints Schedule input data and constraints are modeled by fuzzy numbers. Fuzzy RCPS problem is based on the concept of pair-wise dominance between two fuzzy numbers and solved with the use of simulation. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 0094243X
- Volume :
- 1648
- Issue :
- 1
- Database :
- Academic Search Index
- Journal :
- AIP Conference Proceedings
- Publication Type :
- Conference
- Accession number :
- 101586487
- Full Text :
- https://doi.org/10.1063/1.4912834