Back to Search
Start Over
Scheduling jobs with position and sum-of-processing-time based processing times.
- Source :
-
Applied Mathematical Modelling . Jul2015, Vol. 39 Issue 14, p4013-4021. 9p. - Publication Year :
- 2015
-
Abstract
- The paper is devoted to some single-machine scheduling problems with variable job processing times. The objectives are to minimize the makespan (i.e., the maximum completion time of all jobs), and to minimize the total completion time. For some special cases, we show that these problems can be solved in polynomial time. For some another special cases of the makespan and the total completion time minimization problems, we prove that an optimal schedule has an V-shape property in terms of processing times. We also propose a heuristic algorithm by utilizing the V-shape property. [ABSTRACT FROM AUTHOR]
Details
- Language :
- English
- ISSN :
- 0307904X
- Volume :
- 39
- Issue :
- 14
- Database :
- Academic Search Index
- Journal :
- Applied Mathematical Modelling
- Publication Type :
- Academic Journal
- Accession number :
- 102981693
- Full Text :
- https://doi.org/10.1016/j.apm.2014.12.021