Back to Search Start Over

Keeping Hope Alive.

Authors :
Ellis, Rebecca T.
Source :
Engineered Systems. Nov2015, Vol. 32 Issue 11, p16-16. 1p.
Publication Year :
2015

Abstract

The article discusses aspects of the commissioning standard for the building design system of the regulated and non-regulated industries in the U.S. It states that the end-user requirements and commissioning plans are developed for a variety of projects that utilize automated systems including fire protection and safety systems, electrical power system and heating ventilation and air conditioning. It cites the importance to achieve high-priority system performance of HVAC system.

Details

Language :
English
ISSN :
08919976
Volume :
32
Issue :
11
Database :
Academic Search Index
Journal :
Engineered Systems
Publication Type :
Periodical
Accession number :
110504401