Optimal Capacity Management of Substation Transformers Over Long-Run.

Authors :
Humayun, Muhammad
Sousa, Bruno Jorge Oliveira
Safdarian, Amir
Ali, Mubbashir
Degefa, Merkebu Z.
Lehtonen, Matti
Fotuhi-Firuzabad, Mahmud
Source :
IEEE Transactions on Power Systems. Jan2016, Vol. 31 Issue 1, p632-641. 10p.
Publication Year :
2016

Abstract

The management of transformers’ capacity is a vital task for planners and asset managers due to their high cost. This paper proposes an optimization model for capacity management of transformers in a substation over long-run. The model considers the present worth costs of investment, losses, maintenance, reliability, and the salvage value of transformers for providing the optimal selection and scheduling of multistage transformer installations and their refurbishments. In the optimization model, growing failure rate of transformers along with their age is incorporated and the cumulative loss-of-life (LOL) of transformers is also used in determining their salvage value. The developed model is applied for planning and management of transformer capacities for a residential load dominant two-transformer primary distribution substation over a period of 40 years. The simulations are performed for various case studies representing the situations encountered by utilities. An extensive sensitivity analysis is also conducted for several conditions of the system parameters. The numerical results indicate the worth of inclusion of variable failure rate and LOL of transformers in their capacity management. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
08858950
Volume :
31
Issue :
1
Database :
Academic Search Index
Journal :
IEEE Transactions on Power Systems
Publication Type :
Academic Journal
Accession number :
111983779
Full Text :
https://doi.org/10.1109/TPWRS.2015.2396576