Back to Search Start Over

An On-line Monitoring System for Over-voltages Based on a Two-stage Voltage Divider and Field Measurement Results in Medium-voltage Grids.

Authors :
Zhou, Kai
Xiong, Qing
He, Min
Dong, Lingjiang
Chen, Yalin
Source :
Electric Power Components & Systems. 2016, Vol. 44 Issue 12, p1345-1356. 12p.
Publication Year :
2016

Abstract

An on-line monitoring system based on a two-stage voltage divider is presented for monitoring the switching and lightning over-voltages in 10–35-kV medium-voltage grids. A low-damped capacitive divider (voltage ratio of 1000:1) is designed as an over-voltage monitoring sensor for primary voltage division, and an R-C damped divider is designed for the secondary voltage division (voltage ratio of 10:1 for the 10-kV grid and 20:1 for the 35-kV grid). The divider's designing methods and response characteristics are analyzed. The result of the measurement indicates that the voltage divider has good frequency response, which can meet the requirements for monitoring switching and lightning over-voltages. Moreover, with the data double-buffering and high-speed sampling techniques, this device can collect longer data (64 Mbytes) and shorten the interval (less than 1 sec) at a high sampling rate (up to 20 MHz). Finally, the device has been installed in a 110-kV substation in parallel with a 10-kV bus for two years. Many over-voltage waveforms (including switching, induced lightning, and back-flashover lightning over-voltages) are captured on site. The actual measured results indicate that the device can monitor fast transient over-voltages precisely. [ABSTRACT FROM AUTHOR]

Details

Language :
English
ISSN :
15325008
Volume :
44
Issue :
12
Database :
Academic Search Index
Journal :
Electric Power Components & Systems
Publication Type :
Academic Journal
Accession number :
116621200
Full Text :
https://doi.org/10.1080/15325008.2015.1028117