Cite
Schedule risk modeling in prefabrication housing production.
MLA
Li, Clyde Zhengdao, et al. “Schedule Risk Modeling in Prefabrication Housing Production.” Journal of Cleaner Production, vol. 153, June 2017, pp. 692–706. EBSCOhost, https://doi.org/10.1016/j.jclepro.2016.11.028.
APA
Li, C. Z., Shen, G. Q., Xu, X., Xue, F., Sommer, L., & Luo, L. (2017). Schedule risk modeling in prefabrication housing production. Journal of Cleaner Production, 153, 692–706. https://doi.org/10.1016/j.jclepro.2016.11.028
Chicago
Li, Clyde Zhengdao, Geoffrey Qiping Shen, Xiaoxiao Xu, Fan Xue, Lucila Sommer, and Lizi Luo. 2017. “Schedule Risk Modeling in Prefabrication Housing Production.” Journal of Cleaner Production 153 (June): 692–706. doi:10.1016/j.jclepro.2016.11.028.