大直径高强螺纹钢筋在港珠澳大桥预制墩台中的应用.

Authors :
崔怀俊
盛剑
Source :
China Harbour Engineering. 2017, Vol. 37 Issue 6, p77-80. 4p.
Publication Year :
2017

Abstract

The being built Hongkong-Zhuhai-Macao Bridge is about 50 km, and the major project of bridge and tunnel in the sea is 35.6 km, with a design life of 120 years and 6 years long construction period. This project has the longest mileage, largest investment and the biggest difficulty in construction in China construction history of sea-crossing bridge. In order to accelerate the progress and improve the quality, the technology of the integration of precast and aquatic installation is used in the pile caps and piers of the non -navigable bridges. Deep water pier is divided into two/three prefabrication, and prestressed rolling continuous external thread bars are settled in the pier, with a diameter of 75 mm, yield strength of 830 MPa, and tensile strength of 1 030 MPa. All the installation of steel bar and part of the tensioning of the bottom section pier are completed in the pier precasting yard. The rest of the connection, tensioning, and grouting of the prestressed steel bar are conducted in the water conservancy project site. We emphatically expounded the technical process of the installation of CB03 in pier precast yard and tensioning prestressed steel bars in Hongkong-Zhuhai-Macao Bridge project , which has certain reference value to similar construction engineering projects. [ABSTRACT FROM AUTHOR]

Details

Language :
Chinese
ISSN :
20957874
Volume :
37
Issue :
6
Database :
Academic Search Index
Journal :
China Harbour Engineering
Publication Type :
Academic Journal
Accession number :
123838838
Full Text :
https://doi.org/10.7640/zggwjs201706017